Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 8/20/2024 PERMIT SUB-TYPE: SNEW PERMIT NO: B24-03113
JOB ADDRESS:
13974 JULIANNE LN
FRISCO, TX 75033
DESC:   3961 AC, 4907 SF, 2 STORY
OWNER:
TOLL SOUTHWEST LLC
2557 SW GRAPEVINE PKWY STE 100
GRAPEVINE TX 76051

CONTRACTOR:
TOLL BROTHERS INC (GEN)
2555 SW Grapevine Pkwy, Suite 100
Grapevine TX 76051
ISSUED DATE:
8/20/2024
APPLIED DATE:
8/16/2024
EXPIRED DATE:
5/18/2025
SITE APN:
ADD322555
STATUS:
ISSUED
APPLICANT:
Lori Shaak
2555 SW Grapevine Pkwy #100
Grapevine TX 76051
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
PERCENT CREDIT CARD FEE$15.10
PERCENT CREDIT CARD FEE$2.00
T-POLE RES 09/10/2024 GLQ$30.00
SET 1 PD METER 09/10/2024 HDJ$100.00
1 INCH PD METER$605.00
WATER METER DEPOSIT$150.00
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
Z-FIELDS REIMBURSEMENT FEE$4,257.00
RESIDENTIAL NEW PERMIT FEE$1,681.17
RESIDENTIAL FEE$147.21
RESIDENTIAL MECHANICAL FEE$148.00
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$241.00
SEWER IMPACT FEE$2,344.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$2,216.00
AUTO PROCESSING FEE$221.09
PLUMBING ROUGH-IN 09/27/2024 SMH$30.00
Total Fees:$12,513.57
______  METER PAYMENT
______  T-POLE RES
______  SET 1 PD METER
______  SET 1 PD METER
______  T-POLE RES
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB RES
______  SHEATHING RES
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)