|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/29/2024
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B24-02761
|
JOB ADDRESS: 13985 JULIANNE LN FRISCO, TX 75033 |
DESC:
4074 AC, 5085 SF, 2 STORY |
|
OWNER:
TOLL SOUTHWEST LLC
2557 SW GRAPEVINE PKWY STE 100 GRAPEVINE TX 76051
|
CONTRACTOR:
TOLL BROTHERS INC (GEN)
2555 SW Grapevine Pkwy, Suite 100 Grapevine TX 76051
|
ISSUED DATE: 7/29/2024
APPLIED DATE:7/22/2024
EXPIRED DATE:3/8/2025
SITE APN:ADD322552
STATUS:ISSUED
|
|
APPLICANT:
Lori Shaak
2555 SW Grapevine Pkwy #100 Grapevine TX 76051
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLAN REVIEW FEE | $50.00 |
PERCENT CREDIT CARD FEE | $15.10 |
SLAB RES 09/05/2024 GLQ | $30.00 |
1 INCH PD METER | $605.00 |
WATER METER DEPOSIT | $150.00 |
T-POLE RES 08/01/2024 LUN | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $4,257.00 |
RESIDENTIAL NEW PERMIT FEE | $1,735.50 |
RESIDENTIAL FEE | $152.55 |
RESIDENTIAL MECHANICAL FEE | $135.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $228.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,216.00 |
AUTO PROCESSING FEE | $221.76 |
Total Fees: | $12,495.91 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ T-POLE RES |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|