|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/4/2024
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B24-02583
|
JOB ADDRESS: 151 MADELEINE AVE FRISCO, TX 75033 |
DESC:
5937 AC, 7794 SF, 2 STORY |
|
OWNER:
FIELDS PRESERVE INVESTMENT PAR
1900 N AKARD ST DALLAS TX 75201
|
CONTRACTOR:
Alford Homes LP
17480 Dallas Parkway #112 Dallas TX 75287
|
ISSUED DATE: 9/4/2024
APPLIED DATE:7/18/2024
EXPIRED DATE:5/12/2025
SITE APN:ADD347051
STATUS:ISSUED
|
|
APPLICANT:
Ben Alford
17480 Dallas Pkwy Dallas TX 75287
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLAN REVIEW FEE | $50.00 |
PLAN REVIEW FEE | $50.00 |
PERCENT CREDIT CARD FEE | $15.70 |
1 INCH PD METER | $605.00 |
WATER METER DEPOSIT | $150.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $4,257.00 |
RESIDENTIAL NEW PERMIT FEE | $2,496.44 |
RESIDENTIAL FEE | $233.82 |
RESIDENTIAL MECHANICAL FEE | $168.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $295.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,341.00 |
AUTO PROCESSING FEE | $244.11 |
T-POLE RES 09/27/2024 RWT | $30.00 |
Total Fees: | $13,606.07 |
|
|
| ______ PIER RES |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ T-POLE RES |
______ FOOTINGS RES |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ MISC FRAME RES |
______ SLAB RES |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|