Seal BUILDING
Permit Payment Receipt


CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 7/8/2024 PERMIT SUB-TYPE: SNEW PERMIT NO: B24-02426
JOB ADDRESS:
13607 YELLOWWOOD LN
FRISCO, TX 75033
DESC:   3698 AC, 4662 SF, 2 STORY
OWNER:
TOLL SOUTHWEST LLC
2557 SW GRAPEVINE PKWY STE 100
GRAPEVINE TX 76051

CONTRACTOR:
TOLL BROTHERS INC (GEN)
2555 SW Grapevine Pkwy, Suite 100
Grapevine TX 76051
ISSUED DATE:
7/8/2024
APPLIED DATE:
6/28/2024
EXPIRED DATE:
9/28/2025
SITE APN:
ADD322606
STATUS:
COMPLETED
APPLICANT:
Lori Shaak
2555 SW Grapevine Pkwy #100
Grapevine TX 76051
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
UTILITIES INSPECTION 03/19/2025 BRG$100.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
SET 1 PD METER 07/30/2024 CDR$100.00
DRYWALL RES 11/06/2024 CMM2$30.00
PERCENT CREDIT CARD FEE$15.10
PERCENT CREDIT CARD FEE$4.00
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$2.40
PERCENT CREDIT CARD FEE$13.20
PTO AND MECH ROUGH 10/04/2024 JR2$30.00
SET 1 PD METER 08/01/2024 JXP$100.00
1 INCH PD METER$605.00
WATER METER DEPOSIT$150.00
SLAB RES 08/21/2024 LUN$30.00
ELECT FINAL RES 12/30/2024 LUN$30.00
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
Z-FIELDS REIMBURSEMENT FEE$4,257.00
RESIDENTIAL NEW PERMIT FEE$1,605.22
RESIDENTIAL FEE$139.86
RESIDENTIAL MECHANICAL FEE$135.00
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$221.00
SEWER IMPACT FEE$2,344.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$2,216.00
AUTO PROCESSING FEE$218.76
PTO AND MECH ROUGH 10/14/2024 SME2$30.00
PLUMBING ROUGH-IN 08/06/2024 SMH$30.00
PTO AND MECH ROUGH 09/27/2024 SMH$30.00
Total Fees:$13,263.14
______  METER PAYMENT
______  T-POLE RES
______  SET 1 PD METER
______  SET 1 PD METER
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB RES
______  SLAB RES
______  PTO AND MECH ROUGH
______  SHEATHING RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  LATH RES
______  DRYWALL RES
______  INSULATION RES
______  DRYWALL RES
______  BRICKWALL TIES RES
______  ELECT FINAL RES
______  GAS RELEASE
______  ELECT FINAL RES
______  FLATWORK RES
______  UTILITIES INSPECTION
______  WATER REGISTER
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
______  FLATWORK RES
______  CO AND BUILD FINAL
Notes: