|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/12/2024
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B24-02335
|
JOB ADDRESS: 3753 LACEFIELD DR FRISCO, TX 75033 |
DESC:
3487 AC, 4311 SF, 2 STORY |
|
OWNER:
TAYLOR MORRISON OF TEXAS INC
6735 SALT CEDAR WAY BLDG 1 STE 200 FRISCO TX 75034
|
CONTRACTOR:
BRITTON HOMES / PERRY HOMES CO
9000 GULF FREEWAY HOUSTON TX 77017
|
ISSUED DATE: 7/12/2024
APPLIED DATE:6/24/2024
EXPIRED DATE:4/6/2025
SITE APN:ADD314367
STATUS:ISSUED
|
|
APPLICANT:
Austin Cornett
9000 Gulf Freeway Houston TX 77017
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PERCENT CREDIT CARD FEE | $15.10 |
1 INCH PD METER | $605.00 |
WATER METER DEPOSIT | $150.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $4,257.00 |
RESIDENTIAL NEW PERMIT FEE | $1,494.52 |
RESIDENTIAL FEE | $129.33 |
RESIDENTIAL MECHANICAL FEE | $141.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $235.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,216.00 |
AUTO PROCESSING FEE | $216.75 |
Total Fees: | $12,130.20 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ PTO AND MECH ROUGH |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|