|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/19/2024
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B24-02192
|
JOB ADDRESS: 4328 NEWMAN BLVD FRISCO, TX 75033 |
DESC:
2585 AC, 3119 SF, 2 STORY |
|
OWNER:
CLH20 LLC
150 TURTLE CREEK BLVD STE 103C DALLAS TX 75207
|
CONTRACTOR:
CLH20 LLC
4300 MacArthur Ave, Suite 165 Dallas TX 75209
|
ISSUED DATE: 6/19/2024
APPLIED DATE:6/13/2024
EXPIRED DATE:5/4/2025
SITE APN:ADD233351
STATUS:ISSUED
|
|
APPLICANT:
Lareina Cheung
4300 MacArthur Ave, Suite 165 Dallas TX 75209
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
REPLACEMENT CARD FEE | $10.00 |
PERCENT CREDIT CARD FEE | $15.30 |
PERCENT CREDIT CARD FEE | $0.60 |
1 INCH PD METER | $605.00 |
WATER METER DEPOSIT | $150.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,100.46 |
RESIDENTIAL FEE | $93.57 |
RESIDENTIAL MECHANICAL FEE | $95.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $161.00 |
SEWER IMPACT FEE | $1,404.00 |
THOROUGHFARE IMPACT FEE | $2,808.00 |
WATER IMPACT FEE | $1,404.00 |
AUTO PROCESSING FEE | $141.73 |
PLUMBING ROUGH-IN 10/22/2024 SMH | $30.00 |
Total Fees: | $8,345.16 |
|
|
| ______ T-POLE RES |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|