Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 7/12/2024 PERMIT SUB-TYPE: SNEW PERMIT NO: B24-02133
JOB ADDRESS:
8079 CHALLENGER LN
FRISCO, TX 75034
DESC:   2583 AC, 3218 SF, 3 STORY
OWNER:
FRISCO 32 LLC CADG
1800 VALLEY VIEW LN STE 300
DALLAS TX 75234-8945

CONTRACTOR:
MATTAMY TEXAS, LLC
1801 Wittington Place, Suite 100
Farmers Branch TX 75234
ISSUED DATE:
7/12/2024
APPLIED DATE:
6/10/2024
EXPIRED DATE:
4/2/2025
SITE APN:
ADD204003
STATUS:
ISSUED
APPLICANT:
Missie Sprabary
1801 Wittington Place
Farmers Branch TX 75234
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
PLAN REVIEW FEE$50.00
PERCENT CREDIT CARD FEE$15.10
1 INCH PD METER$605.00
WATER METER DEPOSIT$150.00
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
Z-FIELDS REIMBURSEMENT FEE$0.00
RESIDENTIAL NEW PERMIT FEE$1,134.12
RESIDENTIAL FEE$96.54
RESIDENTIAL MECHANICAL FEE$135.00
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$185.00
SEWER IMPACT FEE$2,344.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$2,186.00
AUTO PROCESSING FEE$123.01
Total Fees:$7,349.77
______  T-POLE RES
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB RES
______  T-POLE RES
______  FIRE RATED WALL RES
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)