APPROVED DATE: 5/28/2024 PERMIT SUB-TYPE: SNEW PERMIT NO: B24-01544
JOB ADDRESS:
13683 ROLLINGWOOD LN
FRISCO, 75033
DESC:   4046 AC, 5390 SF, 2 STORY
OWNER:



CONTRACTOR:
HUNTINGTON HOMES
5601 DEMOCRACY, SUITE 300
PLANO TX 75024
ISSUED DATE:
5/28/2024
APPLIED DATE:
4/24/2024
EXPIRED DATE:
12/20/2025
SITE APN:
ADD314418
STATUS:
COMPLETED
APPLICANT:
Dustin Nichols
5601 Democracy Drive
Plano TX 75024
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
2NDS AND FRAMING 11/01/2024 DP2$30.00
2NDS AND FRAMING 11/08/2024 DP2$30.00
PERCENT CREDIT CARD FEE$2.40
PERCENT CREDIT CARD FEE$2.40
PERCENT CREDIT CARD FEE$2.40
PERCENT CREDIT CARD FEE$12.00
T-POLE RES 06/28/2024 GLQ$30.00
FLATWORK RES 12/31/2024 LUN$30.00
ELECT FINAL RES 01/24/2025 LUN$30.00
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
Z-FIELDS REIMBURSEMENT FEE$4,257.00
RESIDENTIAL NEW PERMIT FEE$1,827.00
RESIDENTIAL FEE$161.70
RESIDENTIAL MECHANICAL FEE$181.00
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$321.00
SEWER IMPACT FEE$2,344.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$2,216.00
SLAB RES 07/12/2024 RWT$30.00
T-POLE RES 07/12/2024 RWT$30.00
PTO AND MECH ROUGH 10/16/2024 SME2$30.00
PTO AND MECH ROUGH 10/24/2024 SME2$30.00
PTO AND MECH ROUGH 10/25/2024 SME2$30.00
PTO AND MECH ROUGH 10/08/2024 SMH$30.00
PTO AND MECH ROUGH 10/21/2024 SMH$30.00
1 INCH PD METER$605.00
WATER METER DEPOSIT$150.00
UTILITIES INSPECTION 02/14/2025 TL$100.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
Total Fees:$13,367.90
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE RES
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB RES
______  T-POLE RES
______  SLAB RES
______  T-POLE RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  DRYWALL RES
______  BRICKWALL TIES RES
______  FLATWORK RES
______  FLATWORK RES
______  ELECT FINAL RES
______  ELECT FINAL RES
______  GAS RELEASE
______  UTILITIES INSPECTION
______  WATER REGISTER
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
Notes: