Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 5/10/2024 PERMIT SUB-TYPE: SNEW PERMIT NO: B24-01528
JOB ADDRESS:
3347 BETONY ST
FRISCO, 75033
DESC:   3499 AC, 4302 SF , 2 STORY
OWNER:



CONTRACTOR:
BRITTON HOMES / PERRY HOMES CO
9000 GULF FREEWAY
HOUSTON TX 77017
ISSUED DATE:
5/10/2024
APPLIED DATE:
4/24/2024
EXPIRED DATE:
5/20/2025
SITE APN:
ADD321624
STATUS:
ISSUED
APPLICANT:
Austin Cornett
9000 Gulf Freeway
Houston TX 77017
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
PERCENT CREDIT CARD FEE$3.00
PERCENT CREDIT CARD FEE$12.10
PERCENT CREDIT CARD FEE$2.40
PERCENT CREDIT CARD FEE$1.80
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$12.60
2NDS AND FRAMING 09/04/2024 GLQ$30.00
T-POLE RES 09/11/2024 GLQ$30.00
PTO AND MECH ROUGH 08/14/2024 JWR$30.00
PTO AND MECH ROUGH 08/22/2024 JWR$30.00
PTO AND MECH ROUGH 08/27/2024 JWR$30.00
PTO AND MECH ROUGH 08/28/2024 JWR$30.00
1 INCH PD METER$605.00
WATER METER DEPOSIT$150.00
T-POLE RES 09/18/2024 LUN$30.00
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
Z-FIELDS REIMBURSEMENT FEE$4,257.00
RESIDENTIAL NEW PERMIT FEE$1,491.64
RESIDENTIAL FEE$129.06
RESIDENTIAL MECHANICAL FEE$135.00
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$228.00
SEWER IMPACT FEE$2,344.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$2,216.00
AUTO PROCESSING FEE$216.41
T-POLE RES 09/16/2024 RWT$30.00
GAS RELEASE 10/29/2024 SME2$30.00
PLUMB MECH FINAL 11/19/2024 SME2$30.00
UTILITIES INSPECTION 11/18/2024 TL$100.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
Total Fees:$13,031.21
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE RES
______  PLUMBING ROUGH-IN
______  SLAB RES
______  SHEATHING RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  T-POLE RES
______  DRYWALL RES
______  T-POLE RES
______  BRICKWALL TIES RES
______  T-POLE RES
______  T-POLE RES
______  FLATWORK RES
______  FLATWORK RES
______  GAS RELEASE
______  ELECT FINAL RES
______  GAS RELEASE
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  WATER REGISTER
______  UTILITIES INSPECTION
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)