|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/8/2024
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B24-01159
|
JOB ADDRESS: 10322 GREAT DAYS DR FRISCO, 75035 |
DESC:
4259 AC, 5184 SF, 2 STORY |
|
|
CONTRACTOR:
TOLL BROTHERS INC (GEN)
2555 SW Grapevine Pkwy, Suite 100 Grapevine TX 76051
|
ISSUED DATE: 4/8/2024
APPLIED DATE:4/1/2024
EXPIRED DATE:5/18/2025
SITE APN:ADD341327
STATUS:ISSUED
|
|
APPLICANT:
Lori Shaak
2555 SW Grapevine Pkwy #100 Grapevine TX 76051
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SLAB RES 04/26/2024 DW2 | $30.00 |
PERCENT CREDIT CARD FEE | $15.10 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $2.60 |
2NDS AND FRAMING 07/02/2024 JDR | $30.00 |
PTO AND MECH ROUGH 06/14/2024 JWR | $30.00 |
PTO AND MECH ROUGH 06/21/2024 JWR | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,765.20 |
RESIDENTIAL FEE | $155.52 |
RESIDENTIAL MECHANICAL FEE | $141.59 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $213.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,176.00 |
AUTO PROCESSING FEE | $136.31 |
FLATWORK RES 09/26/2024 RWK | $30.00 |
PLUMB MECH FINAL 11/07/2024 SMH | $30.00 |
PLUMB MECH FINAL 11/15/2024 SMH | $30.00 |
PLUMB MECH FINAL 11/19/2024 SMH | $30.00 |
1 INCH PD METER | $605.00 |
WATER METER DEPOSIT | $150.00 |
UTILITIES INSPECTION 10/18/2024 TL | $100.00 |
Total Fees: | $8,372.72 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ T-POLE RES |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ LATH RES |
______ DRYWALL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ FLATWORK RES |
______ FLATWORK RES |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|