|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/14/2024 11:00:00 PM
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B24-00373
|
JOB ADDRESS: 353 BUCK RIDGE DR FRISCO, TX 75068 |
DESC:
2150 AC, 2634 SF, 2 STORY |
|
OWNER:
DOE CREEK VENTURES LLC
4204 N INTERSTATE 35 DENTON TX 76207
|
CONTRACTOR:
FIRST INFRA LLC
6600 Paige Rd Suite 224 The Colony TX 75056
|
ISSUED DATE: 3/14/2024 11:00:00 PM
APPLIED DATE:2/8/2024
EXPIRED DATE:3/23/2025
SITE APN:ADD174359
STATUS:ISSUED
|
|
APPLICANT:
Ravi Durairaj
8001 PULLAM CIR PLANO TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLAN REVIEW FEE | $50.00 |
PERCENT CREDIT CARD FEE | $15.30 |
PERCENT CREDIT CARD FEE | $0.60 |
REPLACEMENT CARD FEE | $10.00 |
AUTO PROCESSING FEE | $2.25 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $931.90 |
RESIDENTIAL FEE | $79.02 |
RESIDENTIAL MECHANICAL FEE | $115.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $155.00 |
SEWER IMPACT FEE | $1,619.00 |
THOROUGHFARE IMPACT FEE | $2,735.00 |
WATER IMPACT FEE | $1,836.00 |
PLUMBING ROUGH-IN 04/30/2024 SMH | $30.00 |
1 INCH PD METER | $605.00 |
WATER METER DEPOSIT | $150.00 |
Total Fees: | $8,654.57 |
|
|
| ______ METER PAYMENT |
______ PLUMBING ROUGH-IN |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|