|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/12/2024
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B24-00235
|
JOB ADDRESS: 13689 DALEWOOD MEWS FRISCO, TX 75033 |
DESC:
1810 AC, 2308 SF, 1 STORY |
|
OWNER:
FHQ HOLDINGS LP
1900 N AKARD ST DALLAS TX 75201
|
CONTRACTOR:
Olivia Clarke Homes
5601 Democracy Dr Plano TX 75024
|
ISSUED DATE: 2/12/2024
APPLIED DATE:1/19/2024
EXPIRED DATE:11/15/2024
SITE APN:ADD314437
STATUS:COMPLETED
|
|
APPLICANT:
Melissa Graves
5601 Democracy FRISCO TX 75033
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $1.20 |
SLAB RES 04/25/2024 JR2 | $30.00 |
PTO AND MECH ROUGH 06/10/2024 JR2 | $30.00 |
PLUMBING ROUGH-IN 04/05/2024 JWR | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $4,257.00 |
RESIDENTIAL NEW PERMIT FEE | $813.96 |
RESIDENTIAL FEE | $69.24 |
RESIDENTIAL MECHANICAL FEE | $89.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $140.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,216.00 |
2NDS AND FRAMING 07/16/2024 RWT | $30.00 |
GAS RELEASE 09/19/2024 SME2 | $30.00 |
PTO AND MECH ROUGH 06/17/2024 SMH | $30.00 |
PTO AND MECH ROUGH 06/18/2024 SMH | $30.00 |
1 INCH PD METER | $605.00 |
WATER METER DEPOSIT | $150.00 |
Total Fees: | $11,224.40 |
|
|
| ______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ METER PAYMENT |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|