Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 1/19/2024 PERMIT SUB-TYPE: SNEW PERMIT NO: B24-00064
JOB ADDRESS:
3791 VASE VINE PL
FRISCO, TX 75033
DESC:   2444 AC, 3194 SF, 1 STORY
OWNER:
TAYLOR MORRISON OF TEXAS INC
6735 SALT CEDAR WAY BLDG 1 STE 200
FRISCO TX 75034

CONTRACTOR:
SHADDOCK HOMES LTD
2400 DALLAS PKWY STE 460
PLANO TX 75093
ISSUED DATE:
1/19/2024
APPLIED DATE:
1/5/2024
EXPIRED DATE:
12/22/2024
SITE APN:
ADD314463
STATUS:
ISSUED
APPLICANT:
Erin Storm
2400 Dallas Parkway
Plano TX 75093
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
1 INCH PD METER$65.00
1 INCH PD METER$540.00
WATER METER DEPOSIT$150.00
2NDS AND FRAMING 06/25/2024 RWT$30.00
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
Z-FIELDS REIMBURSEMENT FEE$4,257.00
RESIDENTIAL NEW PERMIT FEE$1,125.96
RESIDENTIAL FEE$95.82
RESIDENTIAL MECHANICAL FEE$95.50
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$176.00
SEWER IMPACT FEE$2,450.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$2,884.00
AUTO PROCESSING FEE$1.70
Total Fees:$12,196.98
______  T-POLE RES
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB RES
______  SLAB RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  SHEATHING RES
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  METER PAYMENT
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)