|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/29/2023
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B23-04936
|
JOB ADDRESS: 3332 BETONY ST FRISCO, TX 75033 |
DESC:
2477 AC, 3030 SF, 2 STORY |
|
OWNER:
CITY OF FRISCO
6101 FRISCO SQUARE BLVD FRISCO TX 75034
|
CONTRACTOR:
TAYLOR MORRISON
6735 SALT CEDAR WAY, BLDG 1, STE 200 FRISCO TX 75034
|
ISSUED DATE: 12/29/2023
APPLIED DATE:12/12/2023
EXPIRED DATE:4/14/2025
SITE APN:ADD321610
STATUS:COMPLETED
|
|
APPLICANT:
Dallas Starts
6735 Salt Cedar Way Frisco TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLAN REVIEW FEE | $50.00 |
PTO AND MECH ROUGH 03/25/2024 DOT | $30.00 |
DRYWALL RES 04/23/2024 DP2 | $30.00 |
DRYWALL RES 04/24/2024 DP2 | $30.00 |
PERCENT CREDIT CARD FEE | $13.80 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $9.10 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $4,257.00 |
RESIDENTIAL NEW PERMIT FEE | $1,070.20 |
RESIDENTIAL FEE | $90.90 |
RESIDENTIAL MECHANICAL FEE | $135.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $206.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,216.00 |
AUTO PROCESSING FEE | $207.78 |
2NDS AND FRAMING 04/11/2024 PJF | $30.00 |
PLUMB MECH FINAL 10/14/2024 SME2 | $30.00 |
PLUMB MECH FINAL 09/16/2024 SMH | $30.00 |
PLUMB MECH FINAL 10/11/2024 SMH | $30.00 |
UTILITIES INSPECTION 08/08/2024 TL | $100.00 |
REPLACE READABLE REGISTER | $355.00 |
1 INCH PD METER | $540.00 |
WATER METER DEPOSIT | $150.00 |
Total Fees: | $12,284.98 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ LATH RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|