Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 1/10/2024 PERMIT SUB-TYPE: CIFO PERMIT NO: B23-04603
JOB ADDRESS:
4800 ELDORADO PKWY 500
FRISCO, TX 75033
DESC:   2218 SF, BLO BLOW DRY BAR AND LASHKIND
OWNER:
A&A PAUL INTERNATIONAL LLC
6383 Francis Ln
Frisco TX 75035

CONTRACTOR:
C Davis Commercial LLC
517 Idlewood Drive
Hitchcock Tx 77563
ISSUED DATE:
1/10/2024
APPLIED DATE:
11/15/2023
EXPIRED DATE:
11/11/2024
SITE APN:
ADD272630
STATUS:
COMPLETED
APPLICANT:
Paul Waltz
2138 N Cleveland Massillon Rd
Akron OH 44333
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
200000
FEE SUMMARY
INSPECTION SUMMARY
PERCENT CREDIT CARD FEE$0.70
AUTO PROCESSING FEE$3.00
COMMERCIAL FEE$118.72
COMMERCIAL MECHANICAL FEE$140.90
COMMERCIAL PLUMBING FEE$229.62
COMMERCIAL RENOVATION APPLICATION FEE$150.00
COMMERCIAL RENOVATION FEE$746.25
MECHANICAL ROUGH 03/22/2024 SDC$35.00
Total Fees:$1,424.19
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB COMM
______  SLAB COMM
______  PLUMB TOP OUT COMM
______  FRAME AND ELEC WALL
______  FLATWORK COMM
______  ELECT RELEASE COMM
______  MECHANICAL ROUGH
______  CEILING
______  GAS PRESSURE
______  CEILING
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  MECHANICAL FINAL
______  MECHANICAL FINAL
______  GAS RELEASE
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  FIRE FINAL
______  PLUMBING FINAL
______  FIRE FINAL
______  INSPECTION ASSIST
______  COMM CO
______  COMM CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)