|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/10/2024
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B23-04376
|
JOB ADDRESS: 13615 DALEWOOD MEWS FRISCO, TX 75033 |
DESC:
2376 AC, 2909 SF, 2 STORY |
|
OWNER:
FHQ HOLDINGS LP
1900 N AKARD ST DALLAS TX 75201
|
CONTRACTOR:
Olivia Clarke Homes
9550 John W Elliott Dr Frisco TX 75033
|
ISSUED DATE: 1/10/2024
APPLIED DATE:10/31/2023
EXPIRED DATE:4/9/2025
SITE APN:ADD314427
STATUS:ISSUED
|
|
APPLICANT:
Melissa Graves
5601 Democracy FRISCO TX 75033
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $2.00 |
PERCENT CREDIT CARD FEE | $12.60 |
PTO AND MECH ROUGH 05/07/2024 JR2 | $30.00 |
FLATWORK RES 07/02/2024 LUN | $30.00 |
SHEATHING RES 05/16/2024 PJF | $30.00 |
SHEATHING RES 05/22/2024 PJF | $30.00 |
2NDS AND FRAMING 05/30/2024 PJF | $30.00 |
PLUMB MECH FINAL 09/17/2024 SME2 | $30.00 |
UTILITIES INSPECTION 09/11/2024 TL | $100.00 |
UTILITIES INSPECTION 09/17/2024 TL | $100.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
1 INCH PD METER | $605.00 |
WATER METER DEPOSIT | $150.00 |
AUTO PROCESSING FEE | $220.55 |
WATER IMPACT FEE | $2,216.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
SEWER IMPACT FEE | $2,344.00 |
RESIDENTIAL PLUMBING FEE | $185.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL MECHANICAL FEE | $135.00 |
RESIDENTIAL FEE | $87.27 |
RESIDENTIAL NEW PERMIT FEE | $1,028.15 |
Z-FIELDS REIMBURSEMENT FEE | $4,257.00 |
FENCE FEE | $20.00 |
AUTO PROCESSING FEE | $6.00 |
PLUMB MECH FINAL 09/10/2024 JWR | $30.00 |
PLUMBING ROUGH-IN 02/20/2024 DOT | $30.00 |
PLUMBING ROUGH-IN 02/08/2024 DOT | $30.00 |
Total Fees: | $12,543.37 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ FIRE RATED WALL RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ SHEATHING RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ SHEATHING RES |
______ SHEATHING RES |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ PTO AND MECH ROUGH |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ WATER REGISTER |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|