|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/14/2023
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B23-04352
|
JOB ADDRESS: 13628 DECLAN ST FRISCO, TX 75033 |
DESC:
2208 AC, 2754 SF, 2 STORY |
|
OWNER:
FHQ HOLDINGS LP
1900 N AKARD ST DALLAS TX 75201
|
CONTRACTOR:
Olivia Clarke Homes
9550 John W Elliott Dr Frisco TX 75033
|
ISSUED DATE: 12/14/2023
APPLIED DATE:10/30/2023
EXPIRED DATE:5/20/2025
SITE APN:ADD322652
STATUS:ISSUED
|
|
APPLICANT:
Melissa Graves
5601 Democracy FRISCO TX 75033
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $540.00 |
WATER METER DEPOSIT | $150.00 |
FIRE RATED WALL RES 03/19/2024 DP2 | $30.00 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $1.80 |
PERCENT CREDIT CARD FEE | $1.20 |
2NDS AND FRAMING 05/07/2024 JDW2 | $30.00 |
GAS RELEASE 10/04/2024 JR2 | $30.00 |
INSULATION RES 06/11/2024 RWT | $30.00 |
PLUMBING ROUGH-IN 01/29/2024 MLM | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $4,257.00 |
RESIDENTIAL NEW PERMIT FEE | $973.90 |
RESIDENTIAL FEE | $82.62 |
RESIDENTIAL MECHANICAL FEE | $122.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $157.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,216.00 |
PLAN REVIEW FEE | $50.00 |
2NDS AND FRAMING 05/24/2024 PJF | $30.00 |
GAS RELEASE 10/25/2024 SME2 | $30.00 |
PLUMB MECH FINAL 11/21/2024 SME2 | $30.00 |
Total Fees: | $11,462.72 |
|
|
| ______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMB MECH FINAL |
______ METER PAYMENT |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|