|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/2/2023
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B23-04238
|
JOB ADDRESS: 14274 NICOLLET DR FRISCO, TX 75033 |
DESC:
4992 AC, 6249 SF, 2 STORY |
|
OWNER:
FHQ HOLDINGS LP
1900 N AKARD ST DALLAS TX 75201
|
CONTRACTOR:
TOLL BROTHERS INC (GEN)
2555 SW Grapevine Pkwy, Suite 100 Grapevine TX 76051
|
ISSUED DATE: 11/2/2023
APPLIED DATE:10/23/2023
EXPIRED DATE:12/29/2024
SITE APN:ADD322167
STATUS:COMPLETED
|
|
APPLICANT:
Terah Montague
2555 SW Grapevine Pkwy #100 Grapevine TX 76051
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS AND FRAMING 02/23/2024 DP2 | $30.00 |
SLAB RES 11/28/2023 DW2 | $30.00 |
PERCENT CREDIT CARD FEE | $13.80 |
PERCENT CREDIT CARD FEE | $4.40 |
PERCENT CREDIT CARD FEE | $2.60 |
1 INCH PD METER | $540.00 |
WATER METER DEPOSIT | $150.00 |
AUTO PROCESSING FEE | $229.81 |
T-POLE RES 11/03/2023 RWK | $30.00 |
PLUMB MECH FINAL 06/10/2024 SME2 | $30.00 |
PLUMB MECH FINAL 06/13/2024 SMH | $30.00 |
UTILITIES INSPECTION 06/17/2024 TL | $100.00 |
UTILITIES INSPECTION 06/10/2024 TL | $100.00 |
WATER IMPACT FEE | $2,216.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
SEWER IMPACT FEE | $2,344.00 |
RESIDENTIAL PLUMBING FEE | $241.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL MECHANICAL FEE | $148.00 |
RESIDENTIAL FEE | $187.47 |
RESIDENTIAL NEW PERMIT FEE | $2,077.21 |
Z-FIELDS REIMBURSEMENT FEE | $4,257.00 |
FENCE FEE | $20.00 |
AUTO PROCESSING FEE | $6.00 |
Total Fees: | $13,087.29 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|