APPROVED DATE: 11/9/2023
|
PERMIT SUB-TYPE: CNEW
|
PERMIT NO: B23-04036
|
JOB ADDRESS: 2151 FIELDS PKWY FRISCO, TX 75033 |
DESC:
18000 SF, FIRE STATION # 10 |
|
OWNER:
FRISCO, CITY OF
FRISCO TX 75034
|
CONTRACTOR:
CROSSLAND CONSTRUCTION CO (GEN)
731 Industry Way Prosper TX 75078
|
ISSUED DATE: 11/9/2023
APPLIED DATE:10/10/2023
EXPIRED DATE:5/20/2025
SITE APN:ADD341647
STATUS:ISSUED
|
|
APPLICANT:
Gunjali Mirajkar
14135 Midway rd Addison TX 75001
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 12000000
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
WATER METER DEPOSIT COMMERCIAL | $1,100.00 |
2 INCH T-10 METER | $1,210.00 |
SET 2 T-10 METER 11/19/2024 CDR | $100.00 |
FRAME COMM 07/29/2024 CW | $35.00 |
PERCENT CREDIT CARD FEE | $1.40 |
PERCENT CREDIT CARD FEE | $46.20 |
AUTO PROCESSING FEE | $0.00 |
COMMERCIAL FEE | $0.00 |
COMMERCIAL BUILDING PERMIT FEE | $0.00 |
COMMERCIAL MECHANICAL FEE | $0.00 |
COMMERCIAL NEW APPLICATION FEE | $0.00 |
COMMERCIAL PLUMBING FEE | $0.00 |
SEWER IMPACT FEE | $0.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $0.00 |
PLUMBING ROUGH-IN 02/16/2024 SDC | $35.00 |
PLUMBING ROUGH-IN 03/28/2024 SDC | $35.00 |
Total Fees: | $2,562.60 |
|
|
| ______ PIER COMM |
______ PLUMBING ROUGH-IN |
______ ELECT ROUGH COMM |
______ FOOTINGS COMM |
______ PLUMBING ROUGH-IN |
______ ELECT ROUGH COMM |
______ PLUMBING ROUGH-IN |
______ ELECT ROUGH COMM |
______ ELECT ROUGH COMM |
______ PLUMBING ROUGH-IN |
______ ELECT ROUGH COMM |
______ PLUMBING ROUGH-IN |
______ ELECT ROUGH COMM |
______ PAVING |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ ELECT ROUGH COMM |
______ SLAB COMM |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ FIRELANE INSPECTION |
______ PLUMBING ROUGH-IN |
______ SLAB COMM |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ CMUWALL |
______ PLUMBING ROUGH-IN |
______ CMUWALL |
______ PLUMB TOP OUT COMM |
______ PLUMB TOP OUT COMM |
______ ELECT ROUGH COMM |
______ GAS PRESSURE |
______ PLUMB TOP OUT COMM |
______ ELECT ROUGH COMM |
______ ELECT ROUGH COMM |
______ PLUMB TOP OUT COMM |
______ ELECT ROUGH COMM |
______ FRAME COMM |
______ T-POLE COMM |
______ FRAME COMM |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SHEATHING COMM |
______ FRAME COMM |
______ MECHANICAL ROUGH |
______ ELECT ROUGH COMM |
______ PLUMB TOP OUT COMM |
______ BRICKWALL TIE COMM |
______ BRICKWALL TIE COMM |
______ BRICKWALL TIE COMM |
______ PLUMB TOP OUT COMM |
______ GAS PRESSURE |
______ BRICKWALL TIE COMM |
______ METER PAYMENT |
______ BRICKWALL TIE COMM |
______ FRAME AND ELEC WALL |
______ INSULATION COMM |
______ BRICKWALL TIE COMM |
______ DRYWALL COMM |
______ MECHANICAL ROUGH |
______ GAS PRESSURE |
______ GAS RELEASE |
______ ELECT RELEASE COMM |
______ SET 2 T-10 METER |
______ SET 2 T-10 METER |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|