|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/11/2023
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B23-03945
|
JOB ADDRESS: 1797 COUSINS TRL FRISCO, TX 75034 |
DESC:
4014 AC, 4983 SF, 2 STORY |
|
OWNER:
GRAND HOMES 2014 LP
15455 DALLAS PKWY STE 1000 ADDISON TX 75001
|
CONTRACTOR:
GRAND TEXAS HOMES GP, LLC
15455 Dallas Pkwy, Suite 1000 Addison TX 75001
|
ISSUED DATE: 10/11/2023
APPLIED DATE:10/4/2023
EXPIRED DATE:11/13/2024
SITE APN:ADD239180
STATUS:ISSUED
|
|
APPLICANT:
Linda Sanville
15455 Dallas Parkway # 1000 Addison TX 75001
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $540.00 |
WATER METER DEPOSIT | $150.00 |
PERCENT CREDIT CARD FEE | $13.80 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $2.60 |
BRICKWALL TIES RES 02/14/2024 GLQ | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,704.73 |
RESIDENTIAL FEE | $149.49 |
RESIDENTIAL MECHANICAL FEE | $135.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $206.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $2,424.00 |
WATER IMPACT FEE | $2,203.00 |
AUTO PROCESSING FEE | $183.72 |
SHEATHING RES 12/11/2023 RWT | $30.00 |
SHEATHING RES 01/09/2024 RWT | $30.00 |
2NDS AND FRAMING 01/31/2024 RWT | $30.00 |
PTO AND MECH ROUGH 01/04/2024 SDC | $30.00 |
PTO AND MECH ROUGH 01/10/2024 SDC | $30.00 |
GAS RELEASE 04/08/2024 SMH | $30.00 |
GAS RELEASE 04/18/2024 SMH | $30.00 |
PLUMB MECH FINAL 05/16/2024 SMH | $30.00 |
UTILITIES INSPECTION 04/30/2024 TL | $100.00 |
Total Fees: | $10,757.14 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ SHEATHING RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ LATH RES |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|