Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 12/13/2023 PERMIT SUB-TYPE: SNEW PERMIT NO: B23-03771
JOB ADDRESS:
3758 LADYWELL RD
FRISCO, TX 75034
DESC:   4114 AC, 4999 SF, 2 STORY
OWNER:
MHI PARTNERSHIP LTD
7676 WOODWAY DR STE 104
HOUSTON TX 77063

CONTRACTOR:
DFH - Coventry Homes
7676 Woodway
Houston TX 77063
ISSUED DATE:
12/13/2023
APPLIED DATE:
9/22/2023
EXPIRED DATE:
3/30/2025
SITE APN:
ADD230543
STATUS:
COMPLETED
APPLICANT:
DFH Coventry Homes
16980 N Dallas Pkwy
Dallas TX 75248
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
PLAN REVIEW FEE$50.00
FLATWORK RES 07/22/2024 DW2$30.00
PERCENT CREDIT CARD FEE$15.10
PERCENT CREDIT CARD FEE$4.00
PERCENT CREDIT CARD FEE$1.20
PERCENT CREDIT CARD FEE$1.20
PERCENT CREDIT CARD FEE$1.20
PERCENT CREDIT CARD FEE$1.80
PERCENT CREDIT CARD FEE$1.80
PERCENT CREDIT CARD FEE$1.80
PERCENT CREDIT CARD FEE$1.80
PERCENT CREDIT CARD FEE$1.20
PERCENT CREDIT CARD FEE$2.40
PERCENT CREDIT CARD FEE$1.20
2NDS AND FRAMING 05/08/2024 GLQ$30.00
DRYWALL RES 06/06/2024 GLQ$30.00
DRYWALL RES 06/10/2024 GLQ$30.00
LATH RES 06/20/2024 GLQ$30.00
FLATWORK RES 07/19/2024 GLQ$30.00
FLATWORK RES 07/24/2024 GLQ$30.00
SET 1 PD METER 01/12/2024 JRC$100.00
SET 1 PD METER 01/16/2024 JXP$100.00
INSULATION RES 05/28/2024 RWT$30.00
INSULATION RES 05/31/2024 RWT$30.00
PLUMB MECH FINAL 09/17/2024 MLM$30.00
PLUMB MECH FINAL 09/24/2024 MLM$30.00
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
Z-FIELDS REIMBURSEMENT FEE$0.00
RESIDENTIAL NEW PERMIT FEE$1,709.69
RESIDENTIAL FEE$149.97
RESIDENTIAL MECHANICAL FEE$148.00
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$271.00
SEWER IMPACT FEE$1,619.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$1,034.00
2NDS AND FRAMING 04/25/2024 RWT$30.00
SHEATHING RES 04/30/2024 RWT$30.00
SHEATHING RES 05/01/2024 RWT$30.00
SHEATHING RES 05/03/2024 RWT$30.00
SHEATHING RES 05/06/2024 RWT$30.00
2NDS AND FRAMING 05/09/2024 RWT$30.00
2NDS AND FRAMING 05/13/2024 RWT$30.00
2NDS AND FRAMING 05/15/2024 RWT$30.00
2NDS AND FRAMING 05/20/2024 RWT$30.00
PLUMBING ROUGH-IN 01/30/2024 SDC$30.00
PLUMBING ROUGH-IN 02/01/2024 SDC$30.00
PTO AND MECH ROUGH 04/10/2024 SMH$30.00
PTO AND MECH ROUGH 04/15/2024 SMH$30.00
PTO AND MECH ROUGH 04/19/2024 SMH$30.00
PTO AND MECH ROUGH 04/22/2024 SMH$30.00
1 INCH PD METER$605.00
WATER METER DEPOSIT$150.00
Total Fees:$7,077.36
______  T-POLE RES
______  T-POLE RES
______  METER PAYMENT
______  SET 1 PD METER
______  SET 1 PD METER
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  SHEATHING RES
______  SHEATHING RES
______  SHEATHING RES
______  SHEATHING RES
______  SHEATHING RES
______  SHEATHING RES
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  INSULATION RES
______  BRICKWALL TIES RES
______  INSULATION RES
______  INSULATION RES
______  INSULATION RES
______  DRYWALL RES
______  DRYWALL RES
______  DRYWALL RES
______  DRYWALL RES
______  LATH RES
______  LATH RES
______  FLATWORK RES
______  FLATWORK RES
______  FLATWORK RES
______  FLATWORK RES
______  ELECT FINAL RES
______  ELECT FINAL RES
______  GAS RELEASE
______  PLUMB MECH FINAL
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  FLATWORK RES
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)