Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 9/27/2023 PERMIT SUB-TYPE: SNEW PERMIT NO: B23-03726
JOB ADDRESS:
13602 ROLLINGWOOD LN
FRISCO, TX 75033
DESC:   4034 AC, 4940 SF, 2 STORY
OWNER:
FHQ HOLDINGS LP
1900 N AKARD ST
DALLAS TX 75201

CONTRACTOR:
BRITTON HOMES / PERRY HOMES CO
9000 GULF FREEWAY
HOUSTON TX 77017
ISSUED DATE:
9/27/2023
APPLIED DATE:
9/20/2023
EXPIRED DATE:
11/17/2024
SITE APN:
ADD314405
STATUS:
COMPLETED
APPLICANT:
Austin Cornett
9000 Gulf Freeway
Houston TX 77017
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
REPLACEMENT CARD FEE$10.00
REPLACEMENT CARD FEE$10.00
2NDS AND FRAMING 02/14/2024 DP2$30.00
PERCENT CREDIT CARD FEE$13.80
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$1.20
PERCENT CREDIT CARD FEE$5.00
GAS RELEASE 04/04/2024 JWR$30.00
UTILITIES INSPECTION 04/26/2024 NMN$100.00
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
Z-FIELDS REIMBURSEMENT FEE$4,257.00
RESIDENTIAL NEW PERMIT FEE$1,691.40
RESIDENTIAL FEE$148.20
RESIDENTIAL MECHANICAL FEE$141.50
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$220.00
SEWER IMPACT FEE$2,344.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$2,216.00
AUTO PROCESSING FEE$220.76
BRICKWALL TIES RES 02/29/2024 RWK$30.00
PLUMBING ROUGH-IN 11/14/2023 SME2$30.00
UTILITIES INSPECTION 04/24/2024 TL$100.00
1 INCH PD METER$540.00
WATER METER DEPOSIT$150.00
Total Fees:$12,615.46
______  METER PAYMENT
______  T-POLE RES
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB RES
______  SHEATHING RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  DRYWALL RES
______  BRICKWALL TIES RES
______  BRICKWALL TIES RES
______  BRICKWALL TIES RES
______  FLATWORK RES
______  ELECT FINAL RES
______  GAS RELEASE
______  GAS RELEASE
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  UTILITIES INSPECTION
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)