|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/27/2023
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B23-03725
|
JOB ADDRESS: 3888 LACEFIELD DR FRISCO, TX 75033 |
DESC:
3733 AC, 4439 SF, 2 STORY |
|
OWNER:
FHQ HOLDINGS LP
1900 N AKARD ST DALLAS TX 75201
|
CONTRACTOR:
BRITTON HOMES / PERRY HOMES CO
9000 GULF FREEWAY HOUSTON TX 77017
|
ISSUED DATE: 9/27/2023
APPLIED DATE:9/20/2023
EXPIRED DATE:1/28/2025
SITE APN:ADD314383
STATUS:COMPLETED
|
|
APPLICANT:
Austin Cornett
9000 Gulf Freeway Houston TX 77017
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
REPLACEMENT CARD FEE | $10.00 |
REPLACEMENT CARD FEE | $10.00 |
SHEATHING RES 02/01/2024 DP2 | $30.00 |
2NDS AND FRAMING 03/18/2024 DP2 | $30.00 |
PERCENT CREDIT CARD FEE | $13.80 |
PERCENT CREDIT CARD FEE | $2.00 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $4.20 |
PERCENT CREDIT CARD FEE | $0.60 |
FLATWORK RES 05/30/2024 GLQ | $30.00 |
GAS RELEASE 05/07/2024 JR2 | $30.00 |
SET 1 PD METER 11/01/2023 JRC | $100.00 |
1 INCH PD METER | $540.00 |
WATER METER DEPOSIT | $150.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $4,257.00 |
RESIDENTIAL NEW PERMIT FEE | $1,535.48 |
RESIDENTIAL FEE | $133.17 |
RESIDENTIAL MECHANICAL FEE | $141.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $227.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,216.00 |
AUTO PROCESSING FEE | $217.48 |
CO AND BUILD FINAL 07/12/2024 RWT | $30.00 |
UTILITIES INSPECTION 06/24/2024 TL | $100.00 |
Total Fees: | $12,478.83 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ LATH RES |
______ GAS RELEASE |
______ FLATWORK RES |
______ FLATWORK RES |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ FLATWORK RES |
______ FLATWORK RES |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|