|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/11/2023
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B23-03711
|
JOB ADDRESS: 14045 MALINDA DR FRISCO, TX 75033 |
DESC:
3003 AC, 4071 SF, 1 STORY |
|
OWNER:
FHQ HOLDINGS LP
1900 N AKARD ST DALLAS TX 75201
|
CONTRACTOR:
HUNTINGTON HOMES
5601 DEMOCRACY, SUITE 300 PLANO TX 75024
|
ISSUED DATE: 10/11/2023
APPLIED DATE:9/19/2023
EXPIRED DATE:2/19/2025
SITE APN:ADD322516
STATUS:COMPLETED
|
|
APPLICANT:
Dustin Nichols
5601 Democracy Drive Plano TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
RESIDENTIAL NEW PERMIT FEE | $794.00 |
2NDS AND FRAMING 02/22/2024 DP2 | $30.00 |
T-POLE RES 12/01/2023 DW2 | $30.00 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $12.60 |
PERCENT CREDIT CARD FEE | $4.00 |
GAS RELEASE 07/01/2024 JR2 | $30.00 |
1 INCH PD METER | $540.00 |
WATER METER DEPOSIT | $150.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $4,257.00 |
RESIDENTIAL NEW PERMIT FEE | $623.72 |
RESIDENTIAL FEE | $122.13 |
RESIDENTIAL MECHANICAL FEE | $148.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $258.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,216.00 |
AUTO PROCESSING FEE | $15.88 |
T-POLE RES 12/08/2023 PJF | $30.00 |
T-POLE RES 12/06/2023 RWK | $30.00 |
UTILITIES INSPECTION 07/15/2024 TL | $100.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
UTILITIES INSPECTION 07/17/2024 TL | $100.00 |
UTILITIES INSPECTION 07/19/2024 TL | $100.00 |
Total Fees: | $12,763.73 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE RES |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ T-POLE RES |
______ T-POLE RES |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|