Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 9/5/2023 PERMIT SUB-TYPE: SNEW PERMIT NO: B23-03168
JOB ADDRESS:
563 MAYFAIR LN
FRISCO, TX 75033
DESC:   3752 AC, 4628 SF, 2 STORY
OWNER:
WINDSOR HOMES CUMBERLAND LLC
8214 WESTCHESTER DR STE 900
DALLAS TX 75225

CONTRACTOR:
WINDSOR HOMES
5310 Harvest Hill Rd 162
Dallas TX 75230
ISSUED DATE:
9/5/2023
APPLIED DATE:
8/15/2023
EXPIRED DATE:
8/26/2024
SITE APN:
ADD298750
STATUS:
COMPLETED
APPLICANT:
Amber Davis
5310 Harvest Hill Rd 162
Dallas TX 75230
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
PTO AND MECH ROUGH 02/21/2024 SDC$15.00
SLAB RES 10/26/2023 DW2$30.00
PERCENT CREDIT CARD FEE$2.60
PERCENT CREDIT CARD FEE$3.50
PERCENT CREDIT CARD FEE$2.60
PERCENT CREDIT CARD FEE$2.00
SET 1 PD METER 10/12/2023 HDJ$100.00
1 INCH PD METER$540.00
WATER METER DEPOSIT$150.00
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
Z-FIELDS REIMBURSEMENT FEE$0.00
RESIDENTIAL NEW PERMIT FEE$1,594.68
RESIDENTIAL FEE$138.84
RESIDENTIAL MECHANICAL FEE$135.00
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$171.00
SEWER IMPACT FEE$2,344.00
THOROUGHFARE IMPACT FEE$4,257.00
WATER IMPACT FEE$2,176.00
AUTO PROCESSING FEE$81.27
2NDS AND FRAMING 02/27/2024 RWK$30.00
ELECT FINAL RES 05/15/2024 RWT$30.00
PTO AND MECH ROUGH 02/21/2024 SDC$15.00
PLUMB MECH FINAL 07/24/2024 SMH$30.00
UTILITIES INSPECTION 06/13/2024 TL$100.00
UTILITIES INSPECTION 07/26/2024 TL$100.00
UTILITIES INSPECTION 08/09/2024 TL$100.00
Total Fees:$12,474.49
______  METER PAYMENT
______  SET 1 PD METER
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  T-POLE RES
______  SLAB RES
______  SLAB RES
______  SLAB RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  DRYWALL RES
______  BRICKWALL TIES RES
______  BRICKWALL TIES RES
______  FLATWORK RES
______  ELECT FINAL RES
______  GAS RELEASE
______  ELECT FINAL RES
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)