Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 10/5/2023 PERMIT SUB-TYPE: SNEW PERMIT NO: B23-03099
JOB ADDRESS:
11554 AUTUMN BREEZE DR
FRISCO, TX 75035
DESC:   3569 AC, 4277 SF, 2 STORY
OWNER:
TEXAS HOMES INC FIRST
12089 HICKORY KNOLL LN
FRISCO TX 75035-5648

CONTRACTOR:
FIRST TEXAS CUSTOM HOMES
500 CRESCENT CT STE 350
DALLAS TX 75201
ISSUED DATE:
10/5/2023
APPLIED DATE:
8/10/2023
EXPIRED DATE:
10/21/2024
SITE APN:
ADD279922
STATUS:
COMPLETED
APPLICANT:
Ana Gutierrez
500 Crescent Court, Suite 350
Dallas TX 75201
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
FLATWORK RES 11/29/2023 CMM2$30.00
2NDS AND FRAMING 12/08/2023 CMM2$30.00
PLAN REVIEW FEE$50.00
2NDS AND FRAMING 12/20/2023 DP2$30.00
2NDS AND FRAMING 01/17/2024 DP2$30.00
2NDS AND FRAMING 12/27/2023 DW2$30.00
2NDS AND FRAMING 01/05/2024 DW2$30.00
2NDS AND FRAMING 01/09/2024 DW2$30.00
INSULATION RES 01/29/2024 DW2$30.00
ELECT FINAL RES 03/19/2024 DW2$30.00
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$1.20
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$1.20
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$1.20
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.60
DRYWALL RES 02/02/2024 JDR$30.00
PLUMB MECH FINAL 04/16/2024 JWR$30.00
AUTO PROCESSING FEE$0.00
FENCE FEE$20.00
Z-FIELDS REIMBURSEMENT FEE$0.00
RESIDENTIAL NEW PERMIT FEE$1,483.64
RESIDENTIAL FEE$128.31
RESIDENTIAL MECHANICAL FEE$128.50
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$192.00
SEWER IMPACT FEE$2,344.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$2,174.00
PLUMBING ROUGH-IN 10/23/2023 SME2$30.00
PTO AND MECH ROUGH 11/29/2023 SME2$30.00
1 INCH PD METER$540.00
WATER METER DEPOSIT$150.00
Total Fees:$7,908.25
______  T-POLE RES
______  PLUMBING ROUGH-IN
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB RES
______  SLAB RES
______  FLATWORK RES
______  PTO AND MECH ROUGH
______  FLATWORK RES
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  INSULATION RES
______  INSULATION RES
______  DRYWALL RES
______  DRYWALL RES
______  BRICKWALL TIES RES
______  ELECT FINAL RES
______  GAS RELEASE
______  ELECT FINAL RES
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  METER PAYMENT
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)