|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/10/2023
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B23-02797
|
JOB ADDRESS: 12035 BRUBAKER DR FRISCO, TX 75033 |
DESC:
2487 AC, 3000 SF, 2 STORY |
|
OWNER:
CLH20 LLC
150 TURTLE CREEK BLVD STE 103C DALLAS TX 75207
|
CONTRACTOR:
CLH20 LLC
4300 MacArthur Ave, Suite 165 Dallas TX 75209
|
ISSUED DATE: 8/10/2023
APPLIED DATE:7/18/2023
EXPIRED DATE:8/26/2024
SITE APN:ADD294755
STATUS:COMPLETED
|
|
APPLICANT:
Lareina Cheung
4300 MacArthur Ave, Suite 165 Dallas TX 75209
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLAN REVIEW FEE | $50.00 |
PLAN REVIEW FEE | $50.00 |
PLAN REVIEW FEE | $50.00 |
T-POLE RES 10/25/2023 DW2 | $30.00 |
PERCENT CREDIT CARD FEE | $13.80 |
PERCENT CREDIT CARD FEE | $14.08 |
PERCENT CREDIT CARD FEE | $0.20 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $2.60 |
DRYWALL RES 04/22/2024 GLQ | $30.00 |
1 INCH PD METER | $540.00 |
WATER METER DEPOSIT | $150.00 |
REPLACEMENT CARD FEE | $10.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $4,257.00 |
RESIDENTIAL NEW PERMIT FEE | $1,060.00 |
RESIDENTIAL FEE | $90.00 |
RESIDENTIAL MECHANICAL FEE | $122.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $170.00 |
SEWER IMPACT FEE | $2,450.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,884.00 |
AUTO PROCESSING FEE | $223.06 |
AUTO PROCESSING FEE | $1.00 |
SLAB RES 12/28/2023 RWK | $30.00 |
2NDS AND FRAMING 03/25/2024 RWT | $30.00 |
PLUMB MECH FINAL 08/19/2024 SME2 | $30.00 |
UTILITIES INSPECTION 08/07/2024 TL | $100.00 |
Total Fees: | $12,716.14 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ FIRE RATED WALL RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ LATH RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|