Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 8/1/2023 PERMIT SUB-TYPE: SNEW PERMIT NO: B23-02720
JOB ADDRESS:
12007 BRUBAKER DR
FRISCO, TX 75033
DESC:   2595 AC, 3088 SF, 2 STORY
OWNER:
CLH20 LLC
150 TURTLE CREEK BLVD STE 103C
DALLAS TX 75207

CONTRACTOR:
CLH20 LLC
4300 MacArthur Ave, Suite 165
Dallas TX 75209
ISSUED DATE:
8/1/2023
APPLIED DATE:
7/12/2023
EXPIRED DATE:
8/13/2024
SITE APN:
ADD294753
STATUS:
COMPLETED
APPLICANT:
Lareina Cheung
4300 MacArthur Ave, Suite 165
Dallas TX 75209
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
PLAN REVIEW FEE$50.00
PERCENT CREDIT CARD FEE$13.80
PERCENT CREDIT CARD FEE$0.20
PERCENT CREDIT CARD FEE$1.80
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$1.20
DRYWALL RES 04/16/2024 GLQ$30.00
REPLACEMENT CARD FEE$10.00
1 INCH PD METER$540.00
WATER METER DEPOSIT$150.00
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
Z-FIELDS REIMBURSEMENT FEE$0.00
RESIDENTIAL NEW PERMIT FEE$1,089.92
RESIDENTIAL FEE$92.64
RESIDENTIAL MECHANICAL FEE$128.50
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$164.00
SEWER IMPACT FEE$1,521.00
THOROUGHFARE IMPACT FEE$3,042.00
WATER IMPACT FEE$1,521.00
AUTO PROCESSING FEE$151.58
AUTO PROCESSING FEE$1.00
2NDS AND FRAMING 03/25/2024 RWT$30.00
PTO AND MECH ROUGH 03/04/2024 SDC$30.00
PTO AND MECH ROUGH 03/07/2024 SDC$30.00
PLUMB MECH FINAL 07/24/2024 SME2$30.00
PLUMB MECH FINAL 07/18/2024 SMH$30.00
Total Fees:$8,985.24
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  T-POLE RES
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB RES
______  SLAB RES
______  FIRE RATED WALL RES
______  SHEATHING RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  BRICKWALL TIES RES
______  INSULATION RES
______  DRYWALL RES
______  DRYWALL RES
______  DRYWALL RES
______  FLATWORK RES
______  ELECT FINAL RES
______  GAS RELEASE
______  GAS RELEASE
______  ELECT FINAL RES
______  ELECT FINAL RES
______  PLUMB MECH FINAL
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)