|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/5/2023
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B23-02339
|
JOB ADDRESS: 11951 BRUBAKER DR FRISCO, TX 75033 |
DESC:
2604 AC, 3148 SF, 2 STORY |
|
OWNER:
CLH20 LLC
150 TURTLE CREEK BLVD STE 103C DALLAS TX 75207
|
CONTRACTOR:
CLH20 LLC
4300 MacArthur Ave, Suite 165 Dallas TX 75209
|
ISSUED DATE: 7/5/2023
APPLIED DATE:6/5/2023
EXPIRED DATE:7/20/2024
SITE APN:ADD294749
STATUS:COMPLETED
|
|
APPLICANT:
Lareina Cheung
4300 MacArthur Ave, Suite 165 Dallas TX 75209
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS AND FRAMING 09/29/2023 DC2 | $30.00 |
PERCENT CREDIT CARD FEE | $13.80 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $1.40 |
REPLACEMENT CARD FEE | $10.00 |
GAS RELEASE 11/29/2023 MLM | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,110.32 |
RESIDENTIAL FEE | $94.44 |
RESIDENTIAL MECHANICAL FEE | $128.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $168.00 |
SEWER IMPACT FEE | $1,521.00 |
THOROUGHFARE IMPACT FEE | $3,042.00 |
WATER IMPACT FEE | $1,521.00 |
AUTO PROCESSING FEE | $152.11 |
PTO AND MECH ROUGH 09/18/2023 SME2 | $30.00 |
GAS RELEASE 12/01/2023 SME2 | $30.00 |
1 INCH PD METER | $540.00 |
WATER METER DEPOSIT | $150.00 |
Total Fees: | $8,899.77 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE RES |
______ SLAB RES |
______ FIRE RATED WALL RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ LATH RES |
______ DRYWALL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMB MECH FINAL |
______ FLATWORK RES |
______ FLATWORK RES |
______ PIER RES |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|