|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/23/2023
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B23-02112
|
JOB ADDRESS: 8683 CLIFF SWALLOW RD FRISCO, 75035 |
DESC:
3395 AC, 4305 SF, 2 STORY |
|
OWNER:
HIGHLAND HOMES
5601 DEMOCRACY DR. STE. 300 PLANO TX 75024
|
CONTRACTOR:
HIGHLAND HOMES
5601 DEMOCRACY DR. STE. 300 PLANO TX 75024
|
ISSUED DATE: 8/23/2023
APPLIED DATE:5/17/2023
EXPIRED DATE:12/17/2024
SITE APN:ADD280246
STATUS:COMPLETED
|
|
APPLICANT:
Sonny Buenteo
5601 Democracy Drive Suite# 300 Plano TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $540.00 |
WATER METER DEPOSIT | $150.00 |
T-POLE RES 04/08/2024 CMM2 | $30.00 |
ELECT FINAL RES 04/25/2024 CMM2 | $30.00 |
PLAN REVIEW FEE | $50.00 |
PERCENT CREDIT CARD FEE | $13.80 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $11.80 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
2NDS AND FRAMING 02/13/2024 JDR | $30.00 |
DRYWALL RES 03/05/2024 JDR | $30.00 |
PLUMBING ROUGH-IN 11/01/2023 JR2 | $30.00 |
PTO AND MECH ROUGH 02/08/2024 JWE2 | $30.00 |
ELECT FINAL RES 04/29/2024 JWE2 | $30.00 |
GAS RELEASE 04/22/2024 MLM | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,492.60 |
RESIDENTIAL FEE | $129.15 |
RESIDENTIAL MECHANICAL FEE | $135.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $228.00 |
SEWER IMPACT FEE | $0.00 |
THOROUGHFARE IMPACT FEE | $1,337.00 |
WATER IMPACT FEE | $2,120.00 |
AUTO PROCESSING FEE | $110.24 |
PTO AND MECH ROUGH 01/25/2024 REED | $30.00 |
FLATWORK RES 05/09/2024 RWK | $30.00 |
PTO AND MECH ROUGH 01/30/2024 SMH | $30.00 |
Total Fees: | $7,478.39 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ T-POLE RES |
______ T-POLE RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ LATH RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|