|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/1/2023
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B23-02089
|
JOB ADDRESS: 11346 SUMMERFIELD RD FRISCO, TX 75035 |
DESC:
4416 AC, 5310 SF, 2 STORY |
|
OWNER:
TEXAS HOMES INC FIRST
12089 HICKORY KNOLL LN FRISCO TX 75035-5648
|
CONTRACTOR:
FIRST TEXAS CUSTOM HOMES
500 CRESCENT CT STE 350 DALLAS TX 75201
|
ISSUED DATE: 6/1/2023
APPLIED DATE:5/18/2023
EXPIRED DATE:7/23/2024
SITE APN:ADD279966
STATUS:COMPLETED
|
|
APPLICANT:
Ana Gutierrez
500 Crescent Court, Suite 350 Dallas TX 75201
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECT FINAL RES 11/14/2023 CMM2 | $30.00 |
ELECT FINAL RES 11/16/2023 CMM2 | $30.00 |
PERCENT CREDIT CARD FEE | $2.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $9.10 |
PERCENT CREDIT CARD FEE | $0.60 |
1 INCH PD METER | $540.00 |
WATER METER DEPOSIT | $150.00 |
T-POLE RES 06/21/2023 JDR | $30.00 |
2NDS AND FRAMING 08/24/2023 JDR | $30.00 |
SET 1 PD METER 06/21/2023 BCB | $100.00 |
PLUMB MECH FINAL 01/11/2024 MLM | $30.00 |
AUTO PROCESSING FEE | $0.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,803.00 |
RESIDENTIAL FEE | $159.30 |
RESIDENTIAL MECHANICAL FEE | $128.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $200.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,174.00 |
UTILITIES INSPECTION 01/08/2024 TL | $100.00 |
REPLACE READABLE REGISTER | $355.00 |
Total Fees: | $8,537.90 |
|
|
| ______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ FLATWORK RES |
______ DRYWALL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ METER PAYMENT |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|