|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/23/2023
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B23-01877
|
JOB ADDRESS: 16677 CHADWELL DR FRISCO, TX 75035 |
DESC:
3719 AC, 4509 SF, 2 STORY |
|
OWNER:
FRISCO PROPERTY LLC 124
1605 LBJ FWY STE 700 DALLAS TX 75234-6099
|
CONTRACTOR:
BEAZER HOMES
1501 LBJ FREEWAY #300 FARMERS BRANCH TX 75234
|
ISSUED DATE: 5/23/2023
APPLIED DATE:5/3/2023
EXPIRED DATE:6/1/2024
SITE APN:ADD269896
STATUS:COMPLETED
|
|
APPLICANT:
Jamie Allen
1501 LBJ Freeway Suite 300 Dallas TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $540.00 |
WATER METER DEPOSIT | $150.00 |
2NDS AND FRAMING 09/15/2023 CMM2 | $30.00 |
DRYWALL RES 10/02/2023 CMM2 | $30.00 |
DRYWALL RES 10/05/2023 CMM2 | $30.00 |
SLAB RES 06/30/2023 DW2 | $30.00 |
PERCENT CREDIT CARD FEE | $1.80 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $2.60 |
BRICKWALL TIES RES 09/19/2023 JDR | $30.00 |
INSULATION RES 09/25/2023 JDR | $30.00 |
PTO AND MECH ROUGH 08/29/2023 JR2 | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,398.84 |
RESIDENTIAL FEE | $120.36 |
RESIDENTIAL MECHANICAL FEE | $135.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $199.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $2,427.00 |
WATER IMPACT FEE | $2,168.00 |
2NDS AND FRAMING 09/06/2023 RWT | $30.00 |
PLUMB MECH FINAL 11/27/2023 SME2 | $30.00 |
UTILITIES INSPECTION 11/27/2023 TL | $100.00 |
Total Fees: | $10,185.00 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ ELECT FINAL RES |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|