|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/23/2023
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B23-01821
|
JOB ADDRESS: 15752 DESERT BROOM RD FRISCO, TX 75035 |
DESC:
2997 AC, 3661 SF, 2 STORY |
|
OWNER:
HOMES LTD SHADDOCK
2400 DALLAS PKWY STE 460 PLANO TX 75093-4381
|
CONTRACTOR:
SHADDOCK HOMES LTD
2400 DALLAS PKWY STE 460 PLANO TX 75093
|
ISSUED DATE: 5/23/2023
APPLIED DATE:5/1/2023
EXPIRED DATE:10/8/2024
SITE APN:ADD281069
STATUS:COMPLETED
|
|
APPLICANT:
Erin Storm
2400 Dallas Parkway Plano TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
FLATWORK RES 01/03/2024 DP2 | $30.00 |
PERCENT CREDIT CARD FEE | $3.00 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $1.80 |
2NDS AND FRAMING 10/18/2023 GLQ | $30.00 |
2NDS AND FRAMING 10/24/2023 GLQ | $30.00 |
INSULATION RES 10/31/2023 GLQ | $30.00 |
1 INCH PD METER | $540.00 |
WATER METER DEPOSIT | $150.00 |
FLATWORK RES 12/29/2023 JDR | $30.00 |
GAS RELEASE 01/16/2024 JR2 | $30.00 |
GAS RELEASE 01/23/2024 JR2 | $30.00 |
GAS RELEASE 01/26/2024 JR2 | $30.00 |
PLUMB MECH FINAL 03/14/2024 JWR | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,283.13 |
RESIDENTIAL FEE | $109.83 |
RESIDENTIAL MECHANICAL FEE | $122.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $185.00 |
SEWER IMPACT FEE | $0.00 |
THOROUGHFARE IMPACT FEE | $1,337.00 |
WATER IMPACT FEE | $2,120.00 |
BRICKWALL TIES RES 11/14/2023 RWK | $30.00 |
PTO AND MECH ROUGH 08/22/2023 SDC | $30.00 |
PTO AND MECH ROUGH 09/19/2023 SDC | $30.00 |
PTO AND MECH ROUGH 09/22/2023 SDC | $30.00 |
PLUMB MECH FINAL 02/26/2024 SME2 | $30.00 |
PTO AND MECH ROUGH 10/12/2023 SMH | $30.00 |
GAS RELEASE 01/30/2024 SMH | $30.00 |
Total Fees: | $6,662.56 |
|
|
| ______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ T-POLE RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ BRICKWALL TIES RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ METER PAYMENT |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|