|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/27/2023
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B23-01654
|
JOB ADDRESS: 15599 PLUM LN FRISCO, TX 75035 |
DESC:
4857 AC, 6224 SF, 2 STORY |
|
OWNER:
NUPUR SHARMA
6201 DEER RUN DR MCKINNEY TX 75070-6633
|
CONTRACTOR:
Superior Modern Homes LLC
PO BOX 15015 Irving Tx 75015
|
ISSUED DATE: 6/27/2023
APPLIED DATE:4/21/2023
EXPIRED DATE:12/16/2024
SITE APN:ADD67106
STATUS:ISSUED
|
|
APPLICANT:
George Barrera
PO BOX 153855 Irving TX 75015
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SLAB RES 01/12/2024 DW2 | $30.00 |
T-POLE RES 07/10/2023 JDR | $30.00 |
PTO AND MECH ROUGH 06/19/2024 JWR | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $2,069.96 |
RESIDENTIAL FEE | $186.72 |
RESIDENTIAL MECHANICAL FEE | $148.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $255.00 |
SEWER IMPACT FEE | $0.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $0.00 |
AUTO PROCESSING FEE | $53.59 |
PLUMBING ROUGH-IN 12/11/2023 SME2 | $30.00 |
Total Fees: | $3,159.27 |
|
|
| ______ T-POLE RES |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|