|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/15/2023
|
PERMIT SUB-TYPE: SADD
|
PERMIT NO: B23-01609
|
JOB ADDRESS: 12259 FARMSTEAD DR FRISCO, TX 75033 |
DESC:
1452 SF, POOL CABANA |
|
OWNER:
EVANS, GRANT & KIMBERLY
FRISCO TX 75033
|
CONTRACTOR:
AQUATERRA OUTDOOR ENVIRONMENTS (GC)
4252 MARSH RIDGE ROAD CARROLLTON TX 75010
|
ISSUED DATE: 5/15/2023
APPLIED DATE:4/18/2023
EXPIRED DATE:10/28/2024
SITE APN:ADD191045
STATUS:ISSUED
|
|
APPLICANT:
Travis Cisneros
4252 Marsh Ridge Road Carrollton TX 75010
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PIER RES 06/22/2023 CMM2 | $30.00 |
ELECT ROUGH RES 06/28/2023 CMM2 | $30.00 |
RESIDENTIAL ACCESSORY STRUCTURE | $530.00 |
RESIDENTIAL FEE | $45.00 |
RESIDENTIAL MECHANICAL FEE | $58.00 |
RESIDENTIAL PLUMBING FEE | $87.00 |
SHEATHING RES 10/02/2023 DC2 | $30.00 |
MISC FRAME RES 10/19/2023 DP2 | $30.00 |
SHEATHING RES 10/04/2023 DW2 | $30.00 |
INSULATION RES 11/10/2023 DW2 | $30.00 |
ELECT RELEASE RES 12/21/2023 DW2 | $30.00 |
PERCENT CREDIT CARD FEE | $1.80 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $1.80 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.61 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PLUMBING ROUGH-IN 07/25/2023 GU | $30.00 |
PLUMBING ROUGH-IN 06/29/2023 JR2 | $30.00 |
PLUMBING TOP OUT 09/29/2023 JR2 | $30.00 |
MECHANICAL ROUGH 10/04/2023 MLM | $30.00 |
PLUMBING TOP OUT 10/04/2023 MLM | $30.00 |
MECHANICAL ROUGH 10/10/2023 MLM | $30.00 |
PLUMBING TOP OUT 10/10/2023 MLM | $30.00 |
MECHANICAL ROUGH 10/13/2023 MLM | $30.00 |
AUTO PROCESSING FEE | $0.40 |
RESIDENTIAL ACCESSORY APPLICATION FEE | $20.00 |
AUTO PROCESSING FEE | $14.40 |
T-POLE RES 12/05/2023 PJF | $30.00 |
BRICKWALL TIES RES 10/30/2023 RWK | $30.00 |
ELECT FINAL RES 04/24/2024 RWT | $30.00 |
PLUMBING TOP OUT 10/02/2023 SDC | $30.00 |
PLUMBING ROUGH-IN 06/28/2023 SMH | $30.00 |
Total Fees: | $1,366.81 |
|
|
| ______ PIER RES |
______ PIER RES |
______ ELECT ROUGH RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ ELECT ROUGH RES |
______ MISC SLAB RES |
______ MISC SLAB RES |
______ MECHANICAL ROUGH |
______ PLUMBING TOP OUT |
______ MISC FRAME RES |
______ PLUMBING TOP OUT |
______ MECHANICAL ROUGH |
______ SHEATHING RES |
______ ELECT ROUGH RES |
______ SHEATHING RES |
______ MECHANICAL ROUGH |
______ PLUMBING TOP OUT |
______ SHEATHING RES |
______ MECHANICAL ROUGH |
______ PLUMBING TOP OUT |
______ ELECT ROUGH RES |
______ MECHANICAL ROUGH |
______ PLUMBING TOP OUT |
______ MECHANICAL ROUGH |
______ MISC FRAME RES |
______ MISC FRAME RES |
______ LATH RES |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ ELECT RELEASE RES |
______ T-POLE RES |
______ T-POLE RES |
______ T-POLE RES |
______ ELECT RELEASE RES |
______ ELECT RELEASE RES |
______ MECHANICAL FINAL |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ MECHANICAL FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|