Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 9/6/2023 PERMIT SUB-TYPE: CNEW PERMIT NO: B23-01407
JOB ADDRESS:
10650 COIT RD
FRISCO, TX 75035
DESC:   41541 SF, SHELL
OWNER:
CAPRUS RE1 LLC

FRISCO TX 75034-4229

CONTRACTOR:
Birch Contracting, LLC
4403 N. Central Expy, Suite 300
Dallas TX 75205
ISSUED DATE:
9/6/2023
APPLIED DATE:
4/6/2023
EXPIRED DATE:
4/26/2025
SITE APN:
ADD330247
STATUS:
ISSUED
APPLICANT:
Zahid Islam
3204 San Patricio Dr
PLANO TX 75025
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
8500000
FEE SUMMARY
INSPECTION SUMMARY
SET 2 T-10 METER 07/29/2024 CDR$100.00
FLATWORK COMM 09/18/2024 CW$35.00
FLATWORK COMM 09/19/2024 CW$35.00
PERCENT CREDIT CARD FEE$1.00
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$1.00
PERCENT CREDIT CARD FEE$1.40
PERCENT CREDIT CARD FEE$46.20
PERCENT CREDIT CARD FEE$2.00
PERCENT CREDIT CARD FEE$2.00
PERCENT CREDIT CARD FEE$2.04
PERCENT CREDIT CARD FEE$0.70
PERCENT CREDIT CARD FEE$0.70
COMM BUILDING PERMIT FEE$50.00
COMM BUILDING PERMIT FEE$50.00
SET 2 T-10 METER 08/02/2024 HDJ$100.00
PLUMB TOP OUT COMM 07/15/2024 JWR$35.00
GREASE TRAP 05/17/2024 MLM$35.00
AUTO PROCESSING FEE$6.00
COMMERCIAL FEE$1,691.64
COMMERCIAL BUILDING PERMIT FEE$17,242.14
COMMERCIAL MECHANICAL FEE$43.50
COMMERCIAL NEW APPLICATION FEE$300.00
COMMERCIAL PLUMBING FEE$3,768.69
SEWER IMPACT FEE$10,714.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$12,718.00
PLUMBING ROUGH-IN 01/19/2024 SME2$30.00
2 INCH T-10 METER$1,210.00
WATER METER DEPOSIT COMMERCIAL$1,100.00
Total Fees:$49,321.61
______  PLUMBING ROUGH-IN
______  ELECT ROUGH COMM
______  PLUMBING ROUGH-IN
______  CONSTRUCTION SAFETY
______  ELECT ROUGH COMM
______  GREASE TRAP
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  ELECT ROUGH COMM
______  PLUMBING ROUGH-IN
______  ELECT ROUGH COMM
______  T-POLE COMM
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
______  ELECT RELEASE COMM
______  PLUMBING ROUGH-IN
______  ELECT ROUGH COMM
______  SLAB COMM
______  ELECT ROUGH COMM
______  PLUMBING ROUGH-IN
______  PAVING
______  PAVING
______  FIRELANE INSPECTION
______  FIRELANE INSPECTION
______  FOOTINGS COMM
______  ELECT ROUGH COMM
______  GREASE TRAP
______  GREASE TRAP
______  PAVING
______  GREASE TRAP
______  GREASE TRAP
______  CMUWALL
______  SLAB COMM
______  PLUMBING ROUGH-IN
______  SHEATHING COMM
______  ELECT ROUGH COMM
______  PLUMB TOP OUT COMM
______  SHEATHING COMM
______  LATH COMM
______  PLUMB TOP OUT COMM
______  PAVING
______  FRAME COMM
______  INSULATION COMM
______  PLUMB TOP OUT COMM
______  METER PAYMENT
______  ELECT ROUGH COMM
______  FRAME COMM
______  SET 2 T-10 METER
______  SET 2 T-10 METER
______  INSULATION COMM
______  LATH COMM
______  SHEATHING COMM
______  FRAME AND ELEC WALL
______  INSULATION COMM
______  SET 2 T-10 METER
______  CEILING
______  SHEATHING COMM
______  LATH COMM
______  FLATWORK COMM
______  FLATWORK COMM
______  ELECT ROUGH COMM
______  FLATWORK COMM
______  ELECT ROUGH COMM
______  FLATWORK COMM
______  MECHANICAL ROUGH
______  INSULATION COMM
______  ELECT RELEASE COMM
______  FLATWORK COMM
______  FLATWORK COMM
______  INSULATION COMM
______  PLUMBING ROUGH-IN
______  ELECT ROUGH COMM
______  INSULATION COMM
______  INSULATION COMM
______  FLATWORK COMM
______  INSULATION COMM
______  CEILING
______  MECHANICAL ROUGH
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)