|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/19/2023
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B23-01283
|
JOB ADDRESS: 3972 GRAYSON LN FRISCO, TX 75033 |
DESC:
3003 AC, 4049 SF, 2 STORY |
|
OWNER:
FHQ HOLDINGS LP
1900 N AKARD ST DALLAS TX 75201
|
CONTRACTOR:
HUNTINGTON HOMES
5601 DEMOCRACY, SUITE 300 PLANO TX 75024
|
ISSUED DATE: 4/19/2023
APPLIED DATE:4/12/2023
EXPIRED DATE:5/29/2024
SITE APN:ADD314444
STATUS:COMPLETED
|
|
APPLICANT:
Dustin Nichols
5601 Democracy Drive Plano TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS AND FRAMING 06/30/2023 CMM2 | $30.00 |
ELECT FINAL RES 09/20/2023 CMM2 | $30.00 |
DRYWALL RES 07/27/2023 DW2 | $30.00 |
SHEATHING RES 08/11/2023 DC2 | $30.00 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $12.00 |
PERCENT CREDIT CARD FEE | $1.20 |
1 INCH PD METER | $540.00 |
WATER METER DEPOSIT | $150.00 |
PERCENT CREDIT CARD FEE | $13.80 |
SLAB RES 05/10/2023 JDR | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $4,257.00 |
RESIDENTIAL NEW PERMIT FEE | $1,410.68 |
RESIDENTIAL FEE | $121.47 |
RESIDENTIAL MECHANICAL FEE | $132.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $256.00 |
SEWER IMPACT FEE | $2,450.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,884.00 |
PLUMB MECH FINAL 11/20/2023 SDC | $30.00 |
PLUMB MECH FINAL 11/14/2023 SME2 | $30.00 |
GAS RELEASE 09/20/2023 SMH | $30.00 |
UTILITIES INSPECTION 11/07/2023 TL | $100.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
Total Fees: | $13,398.25 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE RES |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ SHEATHING RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ ELECT FINAL RES |
______ PLUMB MECH FINAL |
______ ELECT FINAL RES |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|