Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 9/22/2023 PERMIT SUB-TYPE: SNEW PERMIT NO: B23-01252
JOB ADDRESS:
12459 HARVEST MEADOW DR
FRISCO, TX 75033
DESC:   9424 AC, 12782 SF, 2 STORY
OWNER:
MICHAEL ISAAC & STACY LYNN TRS REESE REVOCABLE TRU REESE
12459 HARVEST MEADOW DR
FRISCO TX 75033-2126

CONTRACTOR:
COATS HOMES LLC
3100 MONTICELLO AVE STE 335
DALLAS TX 75205
ISSUED DATE:
9/22/2023
APPLIED DATE:
5/4/2023
EXPIRED DATE:
11/13/2024
SITE APN:
ADD191842
STATUS:
ISSUED
APPLICANT:
Paul Harrison
3100 Monticello Ave. STE 335
Dallas TX 75205
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
PTO AND MECH ROUGH 04/10/2024 CI$30.00
PTO AND MECH ROUGH 04/24/2024 CI$30.00
PIER RES 11/27/2023 DW2$30.00
PERCENT CREDIT CARD FEE$13.80
PERCENT CREDIT CARD FEE$2.40
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
Z-FIELDS REIMBURSEMENT FEE$0.00
RESIDENTIAL NEW PERMIT FEE$3,793.32
RESIDENTIAL FEE$383.46
RESIDENTIAL MECHANICAL FEE$312.50
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$406.00
SEWER IMPACT FEE$2,294.00
THOROUGHFARE IMPACT FEE$5,322.00
WATER IMPACT FEE$3,085.00
T-POLE RES 11/16/2023 RWK$30.00
SHEATHING RES 03/14/2024 RWT$30.00
1 INCH PD METER$540.00
WATER METER DEPOSIT$150.00
Total Fees:$16,778.48
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE RES
______  T-POLE RES
______  PIER RES
______  PIER RES
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB RES
______  SLAB RES
______  SHEATHING RES
______  SHEATHING RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)