|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/11/2023
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B23-00752
|
JOB ADDRESS: 3975 HONEYCUTT DR FRISCO, TX 75033 |
DESC:
2521 AC, 3054 SF, 2 STORY * MODEL* |
|
OWNER:
Olivia Clarke Homes
9550 John W Elliott Dr Frisco TX 75033
|
CONTRACTOR:
Olivia Clarke Homes
9550 John W Elliott Dr Frisco TX 75033
|
ISSUED DATE: 4/11/2023
APPLIED DATE:4/11/2023
EXPIRED DATE:9/1/2024
SITE APN:ADD314457
STATUS:COMPLETED
|
|
APPLICANT:
Melissa Graves
5601 Democracy FRISCO TX 75033
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $490.00 |
WATER METER DEPOSIT | $150.00 |
PERCENT CREDIT CARD FEE | $1.00 |
PLAN REVIEW FEE | $100.00 |
1 INCH PD METER | $50.00 |
FIRE RATED WALL RES 08/02/2023 DC2 | $30.00 |
2NDS AND FRAMING 08/04/2023 DC2 | $30.00 |
FLATWORK RES 10/02/2023 DW2 | $30.00 |
FLATWORK RES 10/03/2023 DW2 | $30.00 |
ELECT FINAL RES 11/06/2023 DW2 | $30.00 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $1.80 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $0.20 |
PERCENT CREDIT CARD FEE | $0.60 |
SLAB RES 05/10/2023 JDR | $30.00 |
SLAB RES 05/15/2023 JDR | $30.00 |
REPLACEMENT CARD FEE | $10.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $4,257.00 |
RESIDENTIAL NEW PERMIT FEE | $1,078.36 |
RESIDENTIAL FEE | $91.62 |
RESIDENTIAL MECHANICAL FEE | $128.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $235.00 |
SEWER IMPACT FEE | $2,450.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,884.00 |
CO AND BUILD FINAL 03/04/2024 RWK | $30.00 |
PLUMBING ROUGH-IN 04/26/2023 SDC | $30.00 |
PLUMBING ROUGH-IN 05/01/2023 SDC | $30.00 |
Total Fees: | $12,557.68 |
|
|
| ______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ FIRE RATED WALL RES |
______ PTO AND MECH ROUGH |
______ FIRE RATED WALL RES |
______ ELECT ROUGH RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ METER PAYMENT |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|