|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/8/2023
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B23-00738
|
JOB ADDRESS: 15702 SONGBIRD ST FRISCO, 75035 |
DESC:
3421 AC, 4154 SF, 2 STORY |
|
|
CONTRACTOR:
HIGHLAND HOMES
5601 DEMOCRACY DR. STE. 300 PLANO TX 75024
|
ISSUED DATE: 3/8/2023
APPLIED DATE:3/8/2023
EXPIRED DATE:5/6/2024
SITE APN:ADD281090
STATUS:COMPLETED
|
|
APPLICANT:
Sonny Buenteo
5601 Democracy Drive Suite# 300 Plano TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $540.00 |
WATER METER DEPOSIT | $150.00 |
PTO AND MECH ROUGH 06/06/2023 CI | $30.00 |
BRICKWALL TIES RES 08/01/2023 CMM2 | $30.00 |
2NDS AND FRAMING 07/12/2023 DP2 | $30.00 |
2NDS AND FRAMING 07/14/2023 DP2 | $30.00 |
2NDS AND FRAMING 07/19/2023 DP2 | $30.00 |
PERCENT CREDIT CARD FEE | $13.80 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $1.80 |
PERCENT CREDIT CARD FEE | $0.60 |
CO AND BUILD FINAL 10/27/2023 GLQ | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,444.28 |
RESIDENTIAL FEE | $124.62 |
RESIDENTIAL MECHANICAL FEE | $152.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $220.00 |
SEWER IMPACT FEE | $0.00 |
THOROUGHFARE IMPACT FEE | $1,273.00 |
WATER IMPACT FEE | $2,120.00 |
AUTO PROCESSING FEE | $107.09 |
ELECT FINAL RES 09/25/2023 RWK | $30.00 |
PTO AND MECH ROUGH 06/16/2023 SME2 | $30.00 |
Total Fees: | $6,716.09 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ FLATWORK RES |
______ SLAB RES |
______ FLATWORK RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ LATH RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ TREE |
______ TREE |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ FLATWORK RES |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|