|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/8/2023
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B23-00735
|
JOB ADDRESS: 16076 GARGANEY CT FRISCO, 75035 |
DESC:
3497 AC, 4345 SF 2 STORY |
|
OWNER:
HIGHLAND HOMES
5601 DEMOCRACY DR. STE. 300 PLANO TX 75024
|
CONTRACTOR:
HIGHLAND HOMES
5601 DEMOCRACY DR. STE. 300 PLANO TX 75024
|
ISSUED DATE: 3/8/2023
APPLIED DATE:3/8/2023
EXPIRED DATE:3/18/2024
SITE APN:ADD281113
STATUS:COMPLETED
|
|
APPLICANT:
Sonny Buenteo
5601 Democracy Drive Suite# 300 Plano TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $540.00 |
WATER METER DEPOSIT | $150.00 |
T-POLE RES 03/16/2023 DW2 | $30.00 |
T-POLE RES 03/30/2023 DW2 | $30.00 |
SLAB RES 04/04/2023 DWF | $30.00 |
PERCENT CREDIT CARD FEE | $13.80 |
PERCENT CREDIT CARD FEE | $0.00 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $10.60 |
PERCENT CREDIT CARD FEE | $2.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
PTO AND MECH ROUGH 05/15/2023 MLM | $30.00 |
PTO AND MECH ROUGH 05/18/2023 MLM | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,505.40 |
RESIDENTIAL FEE | $130.35 |
RESIDENTIAL MECHANICAL FEE | $135.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $221.00 |
SEWER IMPACT FEE | $0.00 |
THOROUGHFARE IMPACT FEE | $1,273.00 |
WATER IMPACT FEE | $2,120.00 |
AUTO PROCESSING FEE | $108.10 |
T-POLE RES 04/03/2023 RWK | $30.00 |
2NDS AND FRAMING 05/24/2023 RWK | $30.00 |
2NDS AND FRAMING 05/25/2023 RWK | $30.00 |
PLUMBING ROUGH-IN 03/27/2023 SMH | $30.00 |
UTILITIES INSPECTION 08/09/2023 TL | $100.00 |
Total Fees: | $7,410.05 |
|
|
| ______ T-POLE RES |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE RES |
______ T-POLE RES |
______ T-POLE RES |
______ FLATWORK RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ LATH RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|