Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 4/25/2023 PERMIT SUB-TYPE: SNEW PERMIT NO: B23-00655
JOB ADDRESS:
1195 CHESTNUT DR
FRISCO, TX 75036
DESC:   3240 AC, 4168 SF, 2 STORY
OWNER:
MATTHEW J MCNEILL
1195 CHESTNUT DR
FRISCO TX 75036

CONTRACTOR:
CORPS RESTORATION
PO Box 471342
Fort Worth TX 76147
ISSUED DATE:
4/25/2023
APPLIED DATE:
4/24/2023
EXPIRED DATE:
8/19/2024
SITE APN:
ADD82840
STATUS:
EXPIRED
APPLICANT:
Jorge Rodriguez
P O Box 471342
Fort Worth TX 76147
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
PLAN REVIEW FEE$100.00
PERCENT CREDIT CARD FEE$2.40
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.60
PLUMBING ROUGH-IN 08/14/2023 MLM$30.00
PLUMBING ROUGH-IN 08/17/2023 MLM$30.00
PLUMBING ROUGH-IN 08/28/2023 MLM$30.00
PTO AND MECH ROUGH 09/19/2023 MLM$30.00
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
Z-FIELDS REIMBURSEMENT FEE$0.00
RESIDENTIAL NEW PERMIT FEE$1,448.76
RESIDENTIAL FEE$125.04
RESIDENTIAL MECHANICAL FEE$135.00
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$213.00
SEWER IMPACT FEE$0.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$0.00
AUTO PROCESSING FEE$40.84
MISC FRAME RES 12/11/2023 RWT$30.00
MISC FRAME RES 12/15/2023 RWT$30.00
MISC FRAME RES 12/18/2023 RWT$30.00
MISC FRAME RES 01/02/2024 RWT$30.00
MECHANICAL ROUGH 10/06/2023 SMH$30.00
Total Fees:$2,664.04
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING TOP OUT
______  PTO AND MECH ROUGH
______  MECHANICAL ROUGH
______  PLUMBING TOP OUT
______  MECHANICAL ROUGH
______  PLUMBING TOP OUT
______  MECHANICAL ROUGH
______  PLUMBING TOP OUT
______  PLUMBING ROUGH-IN
______  MECHANICAL ROUGH
______  PLUMBING TOP OUT
______  MECHANICAL ROUGH
______  PLUMBING TOP OUT
______  SHEATHING RES
______  SHEATHING RES
______  ELECT ROUGH RES
______  MISC FRAME RES
______  MISC FRAME RES
______  MISC FRAME RES
______  MISC FRAME RES
______  PTO AND MECH ROUGH
______  MISC FRAME RES
______  MISC FRAME RES
______  INSULATION RES
______  BRICKWALL TIES RES
______  DRYWALL RES
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)