|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/6/2023
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B23-00489
|
JOB ADDRESS: 11895 BRUBAKER DR FRISCO, TX 75033 |
DESC:
2604 AC, 3161 SF, 2 STORY |
|
OWNER:
CLH20 LLC
150 TURTLE CREEK BLVD STE 103C DALLAS TX 75207
|
CONTRACTOR:
CLH20 LLC
4300 MacArthur Ave, Suite 165 Dallas TX 75209
|
ISSUED DATE: 4/6/2023
APPLIED DATE:2/20/2023
EXPIRED DATE:4/27/2024
SITE APN:ADD294745
STATUS:COMPLETED
|
|
APPLICANT:
Lareina Cheung
4300 MacArthur Ave, Suite 165 Dallas TX 75209
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS AND FRAMING 07/24/2023 CMM2 | $30.00 |
ELECT FINAL RES 09/19/2023 CMM2 | $30.00 |
PLAN REVIEW FEE | $50.00 |
PLAN REVIEW FEE | $50.00 |
SLAB RES 05/03/2023 DC2 | $30.00 |
INSULATION RES 08/04/2023 DC2 | $30.00 |
PERCENT CREDIT CARD FEE | $13.80 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.61 |
PERCENT CREDIT CARD FEE | $10.00 |
PERCENT CREDIT CARD FEE | $0.60 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
T-POLE RES 04/27/2023 JDR | $30.00 |
T-POLE RES 05/01/2023 JDR | $30.00 |
SLAB RES 05/04/2023 JDR | $30.00 |
SLAB RES 05/05/2023 JDR | $30.00 |
1 INCH PD METER | $540.00 |
WATER METER DEPOSIT | $150.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,114.74 |
RESIDENTIAL FEE | $94.83 |
RESIDENTIAL MECHANICAL FEE | $135.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $199.00 |
SEWER IMPACT FEE | $1,521.00 |
THOROUGHFARE IMPACT FEE | $3,042.00 |
WATER IMPACT FEE | $1,521.00 |
AUTO PROCESSING FEE | $154.95 |
Total Fees: | $9,667.73 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE RES |
______ T-POLE RES |
______ T-POLE RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ FIRE RATED WALL RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ ELECT ROUGH RES |
______ ELECT ROUGH RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ WATER REGISTER |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|