|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/16/2023
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B23-00471
|
JOB ADDRESS: 15531 FRINGE TREE RD FRISCO, TX 75035 |
DESC:
2663 AC, 3327 SF, 2 STORY |
|
OWNER:
HOMES LTD SHADDOCK
2400 DALLAS PKWY STE 460 PLANO TX 75093-4381
|
CONTRACTOR:
SHADDOCK HOMES LTD
2400 DALLAS PKWY STE 460 PLANO TX 75093
|
ISSUED DATE: 3/16/2023
APPLIED DATE:2/14/2023
EXPIRED DATE:6/8/2024
SITE APN:ADD280720
STATUS:COMPLETED
|
|
APPLICANT:
Erin Storm
2400 Dallas Parkway Plano TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS AND FRAMING 07/18/2023 DP2 | $30.00 |
2NDS AND FRAMING 08/02/2023 DWF | $30.00 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $2.40 |
PTO AND MECH ROUGH 06/16/2023 JDW2 | $30.00 |
BRICKWALL TIES RES 08/23/2023 JR2 | $30.00 |
1 INCH PD METER | $540.00 |
WATER METER DEPOSIT | $150.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,171.18 |
RESIDENTIAL FEE | $99.81 |
RESIDENTIAL MECHANICAL FEE | $128.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $235.00 |
SEWER IMPACT FEE | $0.00 |
THOROUGHFARE IMPACT FEE | $1,273.00 |
WATER IMPACT FEE | $2,120.00 |
SLAB RES 04/26/2023 PJF | $30.00 |
FLATWORK RES 09/21/2023 PJF | $30.00 |
SLAB RES 04/24/2023 RWK | $30.00 |
SLAB RES 04/27/2023 RWK | $30.00 |
T-POLE RES 05/04/2023 RWK | $30.00 |
T-POLE RES 05/10/2023 RWK | $30.00 |
FLATWORK RES 09/18/2023 RWK | $30.00 |
PLUMB MECH FINAL 12/05/2023 SMH | $30.00 |
Total Fees: | $6,410.69 |
|
|
| ______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ T-POLE RES |
______ T-POLE RES |
______ T-POLE RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ BRICKWALL TIES RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ METER PAYMENT |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|