|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/9/2023
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B23-00420
|
JOB ADDRESS: 3911 HONEYCUTT DR FRISCO, TX 75033 |
DESC:
2591 AC, 3111 SF, 2 STORY * MODEL* |
|
OWNER:
FHQ HOLDINGS LP
1900 N AKARD ST DALLAS TX 75201
|
CONTRACTOR:
TAYLOR MORRISON
6735 SALT CEDAR WAY, BLDG 1, STE 200 FRISCO TX 75034
|
ISSUED DATE: 2/9/2023
APPLIED DATE:2/1/2023
EXPIRED DATE:3/26/2024
SITE APN:ADD314449
STATUS:COMPLETED
|
|
APPLICANT:
Dallas Starts
6735 Salt Cedar Way Frisco TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $540.00 |
WATER METER DEPOSIT | $150.00 |
2NDS AND FRAMING 05/23/2023 CMM2 | $30.00 |
DRYWALL RES 06/06/2023 CMM2 | $30.00 |
FLATWORK RES 06/22/2023 CMM2 | $30.00 |
FLATWORK RES 06/26/2023 CMM2 | $30.00 |
ELECT FINAL RES 07/10/2023 CMM2 | $30.00 |
ELECT FINAL RES 07/12/2023 CMM2 | $30.00 |
ELECT FINAL RES 07/14/2023 CMM2 | $30.00 |
CO AND BUILD FINAL 09/27/2023 DC2 | $30.00 |
PERCENT CREDIT CARD FEE | $13.80 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $12.00 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
SLAB RES 03/23/2023 GLQ | $30.00 |
2NDS AND FRAMING 05/24/2023 JDR | $30.00 |
INSULATION RES 06/01/2023 JDR | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $4,257.00 |
RESIDENTIAL NEW PERMIT FEE | $1,097.74 |
RESIDENTIAL FEE | $93.33 |
RESIDENTIAL MECHANICAL FEE | $139.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $242.00 |
SEWER IMPACT FEE | $2,884.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,884.00 |
AUTO PROCESSING FEE | $232.35 |
CO AND BUILD FINAL 09/14/2023 RWK | $30.00 |
PTO AND MECH ROUGH 04/27/2023 SDC | $30.00 |
PTO AND MECH ROUGH 05/03/2023 SDC | $30.00 |
PTO AND MECH ROUGH 05/05/2023 SDC | $30.00 |
PTO AND MECH ROUGH 05/10/2023 SDC | $30.00 |
PTO AND MECH ROUGH 05/15/2023 SDC | $30.00 |
UTILITIES INSPECTION 08/17/2023 TL | $100.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
Total Fees: | $13,991.92 |
|
|
| ______ PLUMBING ROUGH-IN |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ TREE |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|