|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/20/2023
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B23-00264
|
JOB ADDRESS: 16007 INCA DOVE CT FRISCO, 75035 |
DESC:
3942 AC, 4497 SF, 2 STORY |
|
OWNER:
HIGHLAND HOMES
5601 DEMOCRACY DR. STE. 300 PLANO TX 75024
|
CONTRACTOR:
HIGHLAND HOMES
5601 DEMOCRACY DR. STE. 300 PLANO TX 75024
|
ISSUED DATE: 2/20/2023
APPLIED DATE:2/14/2023
EXPIRED DATE:2/11/2024
SITE APN:ADD281160
STATUS:COMPLETED
|
|
APPLICANT:
Sonny Buenteo
5601 Democracy Drive Suite# 300 Plano TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS AND FRAMING 05/04/2023 DC2 | $30.00 |
T-POLE RES 02/28/2023 DW2 | $30.00 |
T-POLE RES 03/03/2023 DW2 | $30.00 |
T-POLE RES 03/06/2023 DW2 | $30.00 |
SLAB RES 03/20/2023 DW2 | $30.00 |
FLATWORK RES 03/22/2023 DW2 | $30.00 |
PERCENT CREDIT CARD FEE | $13.80 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $3.80 |
PERCENT CREDIT CARD FEE | $0.60 |
FLATWORK RES 03/23/2023 JDR | $30.00 |
PERCENT CREDIT CARD FEE | $2.40 |
PLUMB MECH FINAL 07/26/2023 MRT | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,554.04 |
RESIDENTIAL FEE | $134.91 |
RESIDENTIAL MECHANICAL FEE | $152.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $306.00 |
SEWER IMPACT FEE | $0.00 |
THOROUGHFARE IMPACT FEE | $1,273.00 |
WATER IMPACT FEE | $2,120.00 |
AUTO PROCESSING FEE | $111.21 |
BRICKWALL TIES RES 05/11/2023 RWK | $30.00 |
DRYWALL RES 05/15/2023 RWK | $30.00 |
DRYWALL RES 05/16/2023 RWK | $30.00 |
PLUMB MECH FINAL 08/08/2023 SDC | $30.00 |
UTILITIES INSPECTION 07/13/2023 TL | $100.00 |
1 INCH PD METER | $540.00 |
WATER METER DEPOSIT | $150.00 |
Total Fees: | $7,150.66 |
|
|
| ______ T-POLE RES |
______ T-POLE RES |
______ T-POLE RES |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE RES |
______ SLAB RES |
______ SLAB RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ LATH RES |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|