Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 2/6/2023 PERMIT SUB-TYPE: SNEW PERMIT NO: B23-00206
JOB ADDRESS:
16142 GARGANEY CT
FRISCO, 75035
DESC:   3775 AC, 4457 SF, 2 STORY
OWNER:
AMERICAN LEGEND HOMES
2540 KING ARTHUR BLVD
LEWISVILLE TX 75056

CONTRACTOR:
AMERICAN LEGEND HOMES
2540 KING ARTHUR BLVD
LEWISVILLE TX 75056
ISSUED DATE:
2/6/2023
APPLIED DATE:
1/27/2023
EXPIRED DATE:
2/12/2024
SITE APN:
ADD281116
STATUS:
COMPLETED
APPLICANT:
Liliana Moton
4400 State Highway 121
Lewisville TX 75056
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
DRYWALL RES 04/26/2023 DC2$30.00
T-POLE RES 02/07/2023 DW2$30.00
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$1.80
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.60
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
Z-FIELDS REIMBURSEMENT FEE$0.00
RESIDENTIAL NEW PERMIT FEE$1,541.24
RESIDENTIAL FEE$133.71
RESIDENTIAL MECHANICAL FEE$139.50
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$250.00
SEWER IMPACT FEE$0.00
THOROUGHFARE IMPACT FEE$1,273.00
WATER IMPACT FEE$2,120.00
CO AND BUILD FINAL 08/15/2023 PJF$30.00
2NDS AND FRAMING 04/10/2023 RWK$30.00
BRICKWALL TIES RES 04/18/2023 RWK$30.00
ELECT FINAL RES 06/01/2023 RWK$30.00
1 INCH PD METER$450.00
WATER METER DEPOSIT$150.00
Total Fees:$6,567.05
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE RES
______  T-POLE RES
______  PLUMBING ROUGH-IN
______  T-POLE RES
______  PLUMBING ROUGH-IN
______  SLAB RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  BRICKWALL TIES RES
______  BRICKWALL TIES RES
______  INSULATION RES
______  DRYWALL RES
______  DRYWALL RES
______  DRYWALL RES
______  FLATWORK RES
______  ELECT FINAL RES
______  GAS RELEASE
______  ELECT FINAL RES
______  PLUMB MECH FINAL
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)