|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/14/2023
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B23-00115
|
JOB ADDRESS: 16192 HARRIS HAWK ST FRISCO, 75035 |
DESC:
3468 AC, 4225 SF, 2 STORY |
|
OWNER:
AMERICAN LEGEND HOMES
2540 KING ARTHUR BLVD LEWISVILLE TX 75056
|
CONTRACTOR:
AMERICAN LEGEND HOMES
2540 KING ARTHUR BLVD LEWISVILLE TX 75056
|
ISSUED DATE: 2/14/2023
APPLIED DATE:2/9/2023
EXPIRED DATE:3/18/2024
SITE APN:ADD281185
STATUS:COMPLETED
|
|
APPLICANT:
Liliana Moton
4400 State Highway 121 Lewisville TX 75056
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLAN REVIEW FEE | $50.00 |
ELECT FINAL RES 08/21/2023 DW2 | $30.00 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $1.80 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $0.60 |
PTO AND MECH ROUGH 05/01/2023 MLM | $30.00 |
PTO AND MECH ROUGH 05/11/2023 MLM | $30.00 |
PTO AND MECH ROUGH 05/12/2023 MLM | $30.00 |
PTO AND MECH ROUGH 05/15/2023 MLM | $30.00 |
PTO AND MECH ROUGH 05/19/2023 MLM | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,467.00 |
RESIDENTIAL FEE | $126.75 |
RESIDENTIAL MECHANICAL FEE | $139.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $264.00 |
SEWER IMPACT FEE | $0.00 |
THOROUGHFARE IMPACT FEE | $1,273.00 |
WATER IMPACT FEE | $2,120.00 |
GAS RELEASE 08/17/2023 SDC | $30.00 |
2NDS AND FRAMING 05/24/2023 RWK | $30.00 |
2NDS AND FRAMING 05/26/2023 RWK | $30.00 |
2NDS AND FRAMING 05/31/2023 RWK | $30.00 |
GAS RELEASE 08/14/2023 SMH | $30.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $150.00 |
Total Fees: | $6,702.85 |
|
|
| ______ T-POLE RES |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ FLATWORK RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|