|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/6/2023
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B23-00052
|
JOB ADDRESS: 8447 CHALLENGER LN FRISCO, TX 75034 |
DESC:
2689 AC, 3228 SF, 3 STORY |
|
OWNER:
FRISCO 32 LLC CADG
1800 VALLEY VIEW LN STE 300 DALLAS TX 75234-8945
|
CONTRACTOR:
MATTAMY TEXAS, LLC
1801 Wittington Place, Suite 100 Farmers Branch TX 75234
|
ISSUED DATE: 2/6/2023
APPLIED DATE:2/3/2023
EXPIRED DATE:9/25/2024
SITE APN:ADD204048
STATUS:COMPLETED
|
|
APPLICANT:
Brandi Smith
1801 Wittington Place Farmers Branch TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLAN REVIEW FEE | $50.00 |
PLAN REVIEW FEE | $50.00 |
REPLACEMENT CARD FEE | $10.00 |
ELECT FINAL RES 08/19/2024 DW2 | $30.00 |
ELECT FINAL RES 08/20/2024 DW2 | $30.00 |
PERCENT CREDIT CARD FEE | $14.40 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.20 |
PERCENT CREDIT CARD FEE | $2.80 |
PERCENT CREDIT CARD FEE | $1.80 |
PERCENT CREDIT CARD FEE | $9.10 |
PTO AND MECH ROUGH 02/27/2024 JWR | $30.00 |
1 INCH PD METER | $540.00 |
WATER METER DEPOSIT | $150.00 |
ELECT FINAL RES 08/08/2024 LUN | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,137.52 |
RESIDENTIAL FEE | $96.84 |
RESIDENTIAL MECHANICAL FEE | $146.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $227.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,186.00 |
AUTO PROCESSING FEE | $124.15 |
T-POLE RES 04/13/2023 RWK | $30.00 |
SLAB RES 07/11/2023 RWK | $30.00 |
INSULATION RES 05/16/2024 RWK | $30.00 |
INSULATION RES 05/10/2024 RWT | $30.00 |
UTILITIES INSPECTION 09/18/2024 TL | $100.00 |
REPLACE READABLE REGISTER | $355.00 |
Total Fees: | $8,111.41 |
|
|
| ______ T-POLE RES |
______ T-POLE RES |
______ METER PAYMENT |
______ PLUMBING ROUGH-IN |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ PTO AND MECH ROUGH |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ SHEATHING RES |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ GAS RELEASE |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|