|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/3/2023
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B22-06371
|
JOB ADDRESS: 8396 CHIMNEY SWIFT RD FRISCO, 75035 |
DESC:
3686 AC, 4378 SF, 2 STORY |
|
OWNER:
HIGHLAND HOMES
5601 DEMOCRACY DR. STE. 300 PLANO TX 75024
|
CONTRACTOR:
HIGHLAND HOMES
5601 DEMOCRACY DR. STE. 300 PLANO TX 75024
|
ISSUED DATE: 1/3/2023
APPLIED DATE:1/3/2023
EXPIRED DATE:11/4/2024
SITE APN:ADD281123
STATUS:COMPLETED
|
|
APPLICANT:
Sonny Buenteo
5601 Democracy Drive Suite# 300 Plano TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $540.00 |
WATER METER DEPOSIT | $150.00 |
CO AND BUILD FINAL 04/26/2024 CMM2 | $30.00 |
PLAN REVIEW FEE | $100.00 |
FLATWORK RES 04/26/2023 DC2 | $30.00 |
2NDS AND FRAMING 08/31/2023 DWF | $30.00 |
PERCENT CREDIT CARD FEE | $13.80 |
PERCENT CREDIT CARD FEE | $2.60 |
PERCENT CREDIT CARD FEE | $2.65 |
PERCENT CREDIT CARD FEE | $10.60 |
PERCENT CREDIT CARD FEE | $3.00 |
PERCENT CREDIT CARD FEE | $3.20 |
PERCENT CREDIT CARD FEE | $2.60 |
PERCENT CREDIT CARD FEE | $2.00 |
PERCENT CREDIT CARD FEE | $0.60 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
PTO AND MECH ROUGH 08/09/2023 SDC | $30.00 |
UTILITIES INSPECTION 03/20/2024 NMN | $100.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,468.28 |
RESIDENTIAL FEE | $126.87 |
RESIDENTIAL MECHANICAL FEE | $152.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $292.00 |
SEWER IMPACT FEE | $0.00 |
THOROUGHFARE IMPACT FEE | $1,273.00 |
WATER IMPACT FEE | $2,120.00 |
AUTO PROCESSING FEE | $109.05 |
2NDS AND FRAMING 08/17/2023 PJF | $30.00 |
2NDS AND FRAMING 08/23/2023 PJF | $30.00 |
2NDS AND FRAMING 08/28/2023 PJF | $30.00 |
GAS RELEASE 01/25/2024 SMH | $30.00 |
PTO AND MECH ROUGH 08/03/2023 SDC | $30.00 |
PLUMB MECH FINAL 02/21/2024 SME2 | $30.00 |
PTO AND MECH ROUGH 08/14/2023 SMH | $30.00 |
UTILITIES INSPECTION 02/06/2024 TL | $100.00 |
UTILITIES INSPECTION 02/22/2024 TL | $100.00 |
Total Fees: | $7,828.75 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ WATER REGISTER |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ LATH RES |
______ DRYWALL RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|